My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 04 21
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 04 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:20:50 PM
Creation date
11/27/2017 11:28:12 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
4/16/2008
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~J1J <br />April ~, 2008 <br />Mr. John Day <br />Cabarrus County Manager <br />65 Church Street, SE <br />PO Box ~o~ <br />Concord, NC 28026-0~0~ <br />WILLIAMS ENGINEERING, INC. <br />A Subsidiary of Keck & Wood, Inc. <br />215 Hampton Street, Suite 100 <br />Rock Hill, SC 29730 <br />Phone (803)724.3192 Fax (803)324-8919 <br />RE: Reservation of Capacity variance to the Expansion of the Park Creek Subdivision <br />Mr. Day, <br />Per our meeting with Kassie Goodson in the planning department earlier today, we reviewed the county <br />proposal for ordinance implementation for reservation of capacity and phasing schedule on the new 45 <br />proposed units, repeated below: <br />Year SF Lots/Dwellines <br />2008 <br />2009 5 <br />zoro rz <br />zou >z <br />zor2 rz <br />We believe the phasing schedule should be revised to better accommodate the school capacity issue , <br />specifically as it relates to the overall picture of the master plan of Park Creek. Please see the detail below on <br />the existing vested master plan for Park Creek, which was approved in rgg8 with rq8 units, prior to any of the <br />new controls of the APFO. During the first two phases, q5 total lots have been platted, leaving a balance of ro3 <br />units. The graphic below represents the program we would have to follow based on the current ordinance: <br />Lots Potential Year for development <br />Remaining <br />Park Creek <br />Units with no <br />Restriction 103 2008 <br />2008 <br />5 2009 <br />Requested units 45 r2 2oro <br />underAPFO r2 2ou <br />12 2012 <br />rs•~o <br />ENGINEERING • DESIGN • PLANNING • COMPUTER SERVICES • CAD MAPPING/GIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.