Laserfiche WebLink
<br />1.1 Schedule of Key Public Outreach. Milestones <br />2.1 Population Growth in the Central Area, 2000-2007 <br />2.2 Single-Family Closings in the Central Area and Cabarrus County, 2003-2007 <br />2.3 New Construction Townhouse Closings in the Central Area and Cabarrus County, <br />2003-2007 <br />2.4 EmploymenrTrends by Industry, Study Area, 2000-2007 <br />2.5 Traffic Volumes <br />2.6 Long Range Transportation Plan Projects in the Vicinity of the Study Area <br />1_?mot of r~i~ur~ <br />Figure i -Context and Study Area <br />Figure 2 -Existing Land Use <br />Figure 3 -Existing County Zoning <br />Figure 4 -Approved Subdivisions <br />Figure 5 -Environmental Features <br />Figure 6 -Soils <br />.Figure 7 -Transportation Facilities <br />Figure S -Utility Systems <br />Figure 9 -Community Facilities <br />Figure 10 -Central Area Plan <br />