My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 08 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 08 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:20:07 PM
Creation date
11/27/2017 11:28:46 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/13/2008
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2.6: Long Range Transportation Plan Protects in the Vicinity of the Study Area <br />Horizon Year Roadway Extents Length (mi) Project Estimated <br /> Descri lion Cost <br />2010 NC 49 Harrisburgfo 11.6 Widen from 2 $166.5 million <br /> east of Walker to 4 lanes <br /> Road <br />2020 1-85 Speedway 14.7 Widen from 4 $178.6 million <br /> Blvd. to US to B lanes <br /> 29/601 <br /> connector <br />2020 Poplar Tent Derita Road to 6:0 Widen from 2 54.8 million <br /> Road Westside to 4 lanes <br /> B ass <br />2030 NC 3 Lake Concord 6.b .Widen from 2 $t9.3 million <br /> Road to US to 4 lanes <br /> bol <br />2030 Westside Weddington 2.56 Widen /.pew 525.6million <br /> B ass Road to NC 3 location 4lanes <br />2030 US 601 US 29 to NC 3 3.7 Widen Crom 2 $9.1 million <br /> (S. Union to 4 lanes <br /> Street <br />2030 US 601 NC 3 (S. Union L l5 Widen from 2 52.5 million <br /> Street) to to 4 Ienes <br /> FIQwe Store <br /> Road <br />2030 Cabarrus US 29to NC 3 2.56 Widen ttom 2 $b:6 million <br /> Avenue to 4 lanes. <br />2030 NC 73 NC3 to NC 49 7:02 Widen from 2 $10:2 million <br /> to 4 lanes <br />2030 Old Salisbury NC 3 to eastern 3.1 I Widen from 2 53.? million <br /> Road legof to3lanes <br /> Penninger <br /> Road <br />2030 Pitts School Poplar Tenr 2.84 Widen from 2 ~t I:1 million <br /> Road Road to to 4lanes <br /> Roberta Road <br />2030 Old Charlotte Cabanas 1.09 Widen 2 lanes 5763;000 <br /> Road Avenue to US <br /> 601 <br />Source: Long Range Tra~aponetian Plan, updated May200S <br />Five other projects are named by the Gabarrws-Rowan MPD as priorities. They are= <br />• Widen I-88 from NC 73 to Exit 68 in China Grove. <br />• Westside Bypass US 29 to NC 49. This project will includesjdewalks, bike lanes <br />and mast arms. While currently unfunded, NGDOT has started preserving right- <br />of-way. <br />• Widen and improve NC 3 (Branchview Drive) from Lake Concord Road to US <br />601. This project will: Include sidewalks, bike lanes and metal pole mast arms.. <br />• Upgrade the existing. two lanes of NG 73 from NG 3 to NC 49 including a bypass <br />atone new location. This project will include sidewalks, bike lanes and mast <br />arms. <br />• Widen Rocky River Road from I-485 to NC 49. This project will include <br />sidewalks, bike lanes and mast arms. <br />
The URL can be used to link to this page
Your browser does not support the video tag.