Laserfiche WebLink
C;:ll~~lrrtl~ <br />442,1 Old Ai~~a7 Road (704) 262-6 <br />CaJCOrd, NC 28026.0388 (704) 2G2-6. <br />Facilities & Operations Departure <br />Joe Sides, Director <br />Se <br />To: Pam Dubois, Finance Director Cabarrus County <br />From: Joe Sides, Director of Facilities & OperationsC~ <br />Re: Kannapolis Intermediate Roof Solution UU <br />Since the past meeting that was held on September 9th 2008, Facilities and Operations <br />have made a thorough investigation for the roof solution at Kannapolis Intermediate. <br />We have changed the specifications for the metal roof and received proposals. The <br />specifications include a 20 year weather tightness warranty and a 20 year warranty <br />on the standing seam metal. LaFave's Construction vas the low bidder and we have <br />made phone calls for reference on their work. They have actually retro-fitted a lot of <br />schools with the metal roofing (LaFave's leaflet). The proposed cost that includes <br />guttering is $219,515.00. LaFave's Inc. is a local company and has completed <br />projects with success for Cabarrus County Schools in the past. <br />We have also made numerous phone calls on the Duro-Last fleece back membrane. <br />We have made calls to Michigan and Texas. The Duro-last product at these locations <br />were just installed in the spring of 2008 but really has not been tested during the <br />winter months. The total cost for this product that includes roofing, guttering, tarps, <br />and engineering is $172,325.00. Since this new product has not been on the market <br />for less than 1 year, I am hesitant about using this. <br />Lastly, after careful review of both of the products (metaUmembrane), we feel that <br />the 20 year weather tightness warranty on the metal is the direction that we must <br />proceed with. The availability of the metal is approximately 2-3 weeks. We have <br />placed tarps on the entire gymnasium roof to help protect the gym floor. <br />Please advise asap so that we can proceed to resolve the roofing issue at Kannapolis <br />Intermediate. <br />If any questions, please do not hesitate to call. <br />Budget: Tarp & Labor for gym: $5,000.00 <br />Engineering: 2,300.00 <br />LaFave's Inc.: 219,515.00 <br />Total: <br />$226,815.00 <br />Item# 27 <br />Attachment number 1 <br />Page 154 of 199 <br />