Laserfiche WebLink
(ii) Openings to facilitate automatic equalization of hydrostatic flood forces on <br />walls in accordance with Article 5, Section B(4)(c) when solid foundation <br />perimeter walls are used in Zones A, A0, AE, and Al-30; <br />(e) Usage details of any enclosed areas below the lowest floor. <br />(~ Plans and/or details for the protection of public utilities and facilities such as sewer, <br />gas, electrical, and water systems to be located and constructed to minimize flood <br />damage; <br />(~ Certification that all other Local, State and Federal permits required prior to <br />Floodplain development permit issuance have been received. <br />(h) Documentation for placement of Recreational Vehicles and/or Temporary Structures, <br />when applicable, to ensure that the provisions of Article S, Section B, subsections (6) <br />and (7) of this ordinance are met. <br />(i) A description of proposed watercourse alteration or relocation, when applicable, <br />including an engineering report on the effects of the proposed project on the flood- <br />carrying capacity of the watercourse and the effects to properties located both <br />upstream and downstream; and a map (f not shown on plot plan) showing the <br />location of the proposed watercourse alteration or relocation. <br />(2) Permit Requirements. The Floodplain Development Permit shall include, but not be <br />limited to: <br />(a) A description of the development to be perrnitted under the Floodplain <br />development permit. <br />(b) The Special Flood Hazard Area determination for the proposed development in <br />accordance with available data specified in Article 3, Section B. <br />(c) The regulatory flood protection elevation required for the reference level and all <br />attendant utilities. <br />(d) The regulatory flood protection elevation required for the protection of all public <br />utilities. <br />(e) All certification submittal requirements with timelines. <br />(~ A statement that no fill material or other development shall encroach into the <br />floodway ornon-encroachment area of any watercourse, as applicable. <br />(~ The flood openings requirements, if in Zones A, AO, AE or AI-30. <br />14 <br />