My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2008 12 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2008
>
AG 2008 12 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 3:10:17 PM
Creation date
11/27/2017 11:29:45 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) <br />utilities. <br />The regulatory flood protection elevation required for the protection of all public <br />(e) All certifrcation submittal requirements with timelines. <br />(~ A statement that no fill material or other development shall encroach into the <br />floodway ornon-encroachment area of any watercourse, as applicable. <br />(~ The flood openings requirements, if in Zones A, AO, AE or AI -30. <br />(3) Certification Requirements. <br />(a) Elevation Certificates <br />(i) An Elevation Certificate (FEMA Form 81-31) is required prior to the actual <br />start of any new construction. It shall be the duty of the permit holder to <br />submit to the Floodplain Administrator a certification of the elevation of <br />the reference level, in relation to mean sea level. The Floodplain <br />Administrator shall review the certificate data submitted. Deficiencies <br />detected by such review shall be corrected by the permit holder prior to <br />the beginning of construction. Failure to submit the certification or failure <br />to make required corrections shall be cause to deny a floodplain <br />development permit <br />(ii) A final as-built Elevation Certificate (FEMA Form 81-31) is required after <br />construction is completed and prior to Certificate of <br />Compliance/Occupancy issuance. It shall be the duty of the permit holder <br />to submit to the Floodplain Administrator a certification of final as-built <br />construction of the elevation of the reference level and all attendant <br />utilities. The Floodplain Administrator shall review the certificate data <br />submitted. Deficiencies detected by such review shall be corrected by the <br />permit holder immediately and prior to Certificate of <br />Compliance/Occupancy issuance. In some instances, another certification <br />maybe required to certify corrected as-built construction. Failure to <br />submit the certification or failure to make required corrections shall be <br />cause to withhold the issuance of a Certificate of Compliance/Occupancy. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.