Laserfiche WebLink
(e) Accessory structures shall be firmly anchored in accordance with the provisions of <br />Article S, Section A(1); <br />(~ All service facilities such as electrical shall be installed in accordance with the <br />provisions of Article 5, Section A(4); and <br />(~ Flood openings to facilitate automatic equalization of hydrostatic flood forces shall <br />be provided below regulatory flood protection elevation in conformance with the <br />provisions of Article S, Section B(4)(c). <br />An accessory structure with a footprint less than 1 SO square feet that satisfies the criteria <br />outlined above does not require an elevation or floodproofing certificate. Elevation or <br />floodproofing certifications are required for all other accessory structures in accordance <br />with Article 4, Section B(3). <br />SECTION C. RESERVED. <br />SECTIOND. STANDARDS FOR FLOODPLAINS WITHOUT ESTABLISHED BASE <br />FLOOD ELEVATIONS. <br />Within the Special Flood Hazard Areas designated as Approximate Zone A and established in <br />Article 3, Section B, where no Base Flood Elevation (BFE) data has been provided by FEMA, the <br />following provisions, in addition to the provisions of Article 5, Section A, shall apply: <br />(1) No encroachments, including fill, new construction, substantial improvements or new <br />development shall be permitted within a distance of twenty (20) feet each side from top of <br />bank or five times the width of the stream, whichever is greater, unless certification with <br />supporting technical data by a registered professional engineer is provided demonstrating <br />that such encroachments shall not result in any increase in flood levels during the <br />occurrence of the base flood discharge. <br />(2) The BFE used in determining the regulatory flood protection elevation shall be determined <br />based on the following criteria: <br />(a) When Base Flood Elevation (BFE) data is available from other sources, all new <br />construction and substantial improvements within such areas shall also comply with <br />all applicable provisions of this ordinance and shall be elevated or floodproofed in <br />accordance with standards in Article S, Sections A and B. <br />(b) When floodway data is available from a Federal, State, or other source, all new <br />construction and substantial improvements within floodway areas shall also comply <br />with the requirements of Article 5, Sections B and F. <br />(c) All subdivision, manufactured home park and other development proposals shall <br />provide Base Flood Elevation (BFE) data if development is greater than five (5) <br />acres or has more than fifty (SO) lots/manufactured home sites. Such Base Flood <br />Elevation (BFE) data shall be adopted by reference in accordance with Article 3, <br />Section B and utilized in implementing this ordinance. <br />23 <br />