My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 03 26
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 03 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2008 8:36:45 AM
Creation date
11/27/2017 11:30:12 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/26/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHAN4E ORDER 1'WO <br />Date: February 21, 2007 <br />Agreement Date: December 19, 2006 <br />Project: North Cgbarrua Park -Phase ill <br />Owner: Cabarrus County Park and Recreatbn Department <br />Contractor: Ike's Construction, Inc. <br />WiCD~: 40500.01.CL <br />The following changes and/or additions are hereby made to the Contract Documents: <br />Underout 1200 SY at 1 foot deep <br />12" A9C 1200 SY <br />1100 Qrtd . <br />Labor to install grid <br />400 CY (~ $4.00= $ 1,800.00 <br />860 tonst{~ $28.00= $23,800.00 <br />9 rolls ~ $820/roller $ 7,360.00 <br />2800 SY ®$1.00= S 2,800.00 <br />Subtotal $35,580.00 <br />Additional items to complete the area and stabilize the site due tc no work undl ooundl <br />approval: <br />Undercut/replace thsother half <br />of the parking bt 12"deep 400 CY (~ $8.00= $ 3,200.00 <br />Seeding 1 LS (~ 2400.00= $ 2,400.00 <br />Re-rrwbNization 1 LS ®$800.00 $,,.,,~QQ,~Q <br />Subtotal $41,980.00 <br />O&P 1096 ~ ~,~98.00 <br />Total $48,178.00 <br />Additions! lima for the additfonat testing by Trtgan Engineering $ 3,000.00 <br />Total Change OMer Two $48,178.OQ <br />JustWloation for Change OMsr: <br />Ths parking lot area is very unstabb and will need measures for completing the surfacing. <br />The soil was teebed thrpugh the entire phase of plaosnrent and was very stable. The <br />placement was observed and checked for oompacton and moisture content. Each layer,had <br />pasted leatinp and was~ready for the atone base when the concrote truck almost got stuck it <br />appears that the motature was pulled up into the new fill with ap the compaction and working <br />the soil. <br />We are r~ecommsnding That in March we check the stability of the soil and begin with removing <br />the top twelve Inches of soil to add additional stone base wHh geogrid to bridge the soil. 8y <br />Change OMerTwo <br />Pegs 1 of 2 <br />~a0 <br />