My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 08 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 08 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:15 PM
Creation date
11/27/2017 11:31:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/20/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 15-2 How to Use this Chapter <br />Information in this Chapter is organized as follows: <br />What do the words and hrases used in this Cha ter mean? Section 15-3 <br />What s of uses and rmits does this Cha ter a I to? Section 15-4 <br />What do I submit with m a lication? Section 15-5 <br />How is my application processed? Who determines whether Section 15-6 <br />facilities are ade uate? <br />What happens if facilities are adequate? What if facilities are Section 15-7 <br />presently inadequate? What conditions will apply to my <br />a lication if facilities are inade uate? <br />If facilities are not adequate, do I always have to phase my Section 15-8 <br />development or wait until they are adequate? Or, do I have <br />the option to provide the facilities so that I can move my <br />lans forward? <br />Where (over what area) are facilities required to be adequate? Section 15-9, <br />What if my project has impacts outside of Cabarrus County, or with some <br />is located in a municipality in the County? particular rules <br /> in Sections 15- <br /> 12 through 15- <br /> 20. <br />If facilities are determined to be adequate or conditions are Section 15-10 <br />imposed, how long does this determination last? What effect <br />does it have on other permits that I need? If my project does <br />not build out for awhile, will I have to go through the <br />determination a ain? <br />What are the standards for assessing whether or not facilities Sections 15-12 <br />are "ade uate"? throw h 15-20 <br />What if I am already partially through the permitting process? Section 15-21 <br />Do I have to comply with this Chapter? If so, what <br />re uirements a I ? <br />DRAFT TEXT OPTION 2 <br />8/20/2007 - 3 - <br />C:\DOCUments and Settings\gkhoneycutt\Local Settings\Temporary Internet <br />Files\OLK7\APFO_draflforBOCoption2_08 20_07_meeting.doc <br />~- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.