My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:22 PM
Creation date
11/27/2017 11:31:39 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/18/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CURRENT LANGUAGE <br />site is adequate to assure the stability of the proposed Wireless <br />Telecommunications Facilities on the proposed site. <br />G) In the case of a new Tower, the Applicant shall be required to submit a <br />written report demonstrating its meaningful efforts to secure shared use <br />of existing Tower(s) or the use of alternative buildings or other structures <br />within the County. Copies of written requests and responses for shared <br />use shall be provided to the County in the Application, along with any <br />letters of rejection stating the reason for rejection. <br />H) The Applicant shall certify that the Telecommunication Facility, <br />foundation and attachments are designed and will be constructed to <br />meet all local, County, State and Federal structural requirements for <br />loads, including wind and ice loads. <br />I) The Applicant shall certify that the Wireless Telecommunications Facilities <br />will be effectively grounded and bonded so as to protect persons and <br />property and installed with appropriate surge protectors. <br />K) The Applicant shall furnish a Visual Impact Assessment, which shall <br />include: <br />1) A "Zone of Visibility Map" which shall be provided in order to <br />determine locations from which the Tower may be seen. <br />2) Pictorial representations of "before and after" views from key <br />viewpoints both inside and outside of the County as may be <br />appropriate, including but not limited to state highways and other <br />major, roads; state and local parks; other public lands; historic <br />districts; preserves and historic sites normally open to the public; <br />and from any other location where the site is visible to a large <br />number of visitors, travelers or residents. Guidance will be <br />provided, concerning the appropriate key sites at apre-application <br />meeting. <br />3) An assessment of the visual impact of the Tower base, guy wires <br />and accessory buildings from abutting and adjacent properties and <br />street's as relates to the need or appropriateness of screening. <br />r.) The Applicant shall demonstrate and provide in writing and/or by drawing <br />how it shall effectively screen from view the base and all related facilities <br />and structures of the proposed Wireless Telecommunications Facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.