My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:22 PM
Creation date
11/27/2017 11:31:39 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/18/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIA Document G606r" - 2000 <br />Amendrteent to the Professional Services Agreement <br />T0: Mike Downs <br />(Owner's Represenmtivej <br />In accordance with the Agreement dated: August 26, 2004 <br />BETWEEN the Owner: <br />Cabamis County <br />65 Church Street SE <br />P. O. Box 707 <br />Concord, NC 28026-0707 <br />and the Architect <br />Ware Bonsall Architects, fnc. <br />10710 Sikes Place, Suite l25 <br />Charlotte, NC 28277 <br />for the Project: <br />.Name and address] <br />Cabarrus County Law Enforcement Center <br />Concord, NC <br />Authorization is reques[ed <br />® to proceed with Additional Services or a Change in Services. <br />^ to incur Additional Reimbursable Expenses. <br />Amendment Number: 011 <br />As Follows: <br />I. Architectural modifications and enhancements to fhe exterior design of the Housing Building, based on the <br />compromise reached between the County and the City of Concord, to comply with the terms of the Conditional Use <br />Permit. Modifications to the design included changing exterior wall material from precast concrete to brick, <br />developing articulated brick patterns on the building and changing the material of the Connector from metal patiels <br />to Glass Fiber Reinforced Concrete (GFRC) panels. Thirty-five sheets of revised drawings include building <br />cleva«ons, building sections, wall sections, wall and window details, floor plans and enlarged floor plans: <br />2. Civil Engineering scope changes associated with site permitting by NCDENR and the City of Concord including <br />water and sewer, erosion control, curbs along Corban Avenue and parking lot grading revisions. <br />The following adjustments shall be made to compensa[ion and time. <br />(Insert provisions in nccordance with the Agreement, or as otherwise ngreed by the parries.) <br />Compensation: <br />Stipulated Sum as follows: <br />I. Architectural Services: $ 63,600.00 <br />2. Civil Engineering Services: $ 12,000.00 <br />Total: $ 75,600.00 <br />Time: <br />No change <br />-~ <br />aiA peeuaent 0606` - 3000. COpysSgnC ~ 3001 by Tne ane[ican IneLlLUCe of a[Cn1LaCCe. All eipncs re9eivaa. YaaalaGa This ata pocueenc <br />'a p[oceaad by 9. s. :opyn9hc 4ex antl SnbmaLloml iruciea. pnaatnocized repsoduccion or diaatibuiion of tnia aIa pocunenL, oe any <br />poccion of SC, a.y i+aulc in aevese civil entl ciininel -snalciu, and viii Oe proaecu Led Lp cha maninum e..<CehL posalnla ureter Lhe lav. <br />TniE dia C[ Ya9 DrGdYtld by A[A aOLCVa[e a[ 16:55: as pn 0a/Y9/30o6 Unaei ONei No.20002]1EJ6 1 vhlcn a%pl[t9 an 6/8/100], dna i4 nOt Ln[ <br />nNle' (iv41ai 99681 <br />va+e aoau <br />
The URL can be used to link to this page
Your browser does not support the video tag.