Laserfiche WebLink
ATTACHMENT "C" <br />SCHEDULE OF DRAWINGS <br />Civil/Landscape <br />L-1 Existing Conditions Survey <br />L-2 Phase I Demolition Plan <br />L-3 Phase II Demolition Plan <br />L-4 Site Layout <br />L-5 Phase I Erosion Control Plan <br />L-6 Grading Plan <br />L-7 Phase II Erosion Control Plan <br />L-8 Driveway Profile <br />L-9 Landscaping Plan <br />L-10 Details <br />L-11 Pre Developed'Drainage Map <br />L-12 Post Developed Drainage Map <br />L-13 Erosion Control Drainage Map <br />Architectural <br />C-1 Architectural Cover Sheet and Appendix B <br />A-1 Floor Plan, Building. Section, Door Schedule, Finish Schedule <br />A-2 Building Elevations <br />A-3 Wall Sections ~ <br />A-4 Reflected Ceiling Plan and Details <br />A-5 Interior Elevations and Details <br />A-6 Storage Buildi~g Plan, Elevations and Details <br />'€ <br />Plumbing <br />P-1 Plumbing Schedules and Details <br />P-2 Plumbing Floor Plan <br />HVAC <br />M-1 Mechanical Floor Plan <br />M-2 Mechanical Details and Schedule <br />ElectricaUli hg tins <br />ES-1 Electrical Site elan <br />E-1 Electrical Floor Plan <br />E-2 Electrical Det~ila <br />SD-1 <br /> <br />~ (~ I <br />