My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:22 PM
Creation date
11/27/2017 11:31:39 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/18/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Metal Roofs on Scale House and Storage Building, Add Eight Thousand Dollazs ($8,000). <br />§',4.3 Unit prices, if any, are as follows: <br />Description <br />See Attachment "A" <br />ARTICLE 5 PAYMENTS- <br />Q 5.1 PROGRESS PAYMENTS <br />§ 5.1.1 Based upon Applicatic <br />:Payment issued by rite Archit <br />_n~ ...,.,..,._.,.. .a,.a r_,a,... <br />5.1.2 The pe: <br />§'5.1.3 Providi <br />a month, the <br />month. If an F <br />shall be Made <br />`.Payment. " <br />§ 5.1.4 Each A <br />z+,. _....._ <br />'~ Sum among the <br />by such d$fa to <br />Architect,"Shall <br />Payment shall be based on [he most recent schedule of values submitted by the <br />If~ahe Contract Documents. The schedule of values shall allocate [he en[tre Contract <br />i(tns of the Work. The schedule of values shall be prepared in such form and supported <br />its accuracy as [he Architect may require. This schedule, unless objected to by the <br />basis for reviewing the Contractor's Applications for Payment. <br />§,5.1.5 Applications fOf Payment shallndicate [he percentage of completion of each portion of the Work as of the <br />yhd of the period covbted by the Applicaton for Payment. <br />§-5.1.6 SubjecttG ofherprovisions of the Contract Documents, the amount of each progress payment shall be <br />computed a5follows;- <br />.1. - Take [hat pt3r[ion of the Contract Sum properly allocable to completed Work as determined by <br />'multiplying the percentage completion of each portion of the Work by the shaze of the Contract Sum <br />allocated ro that portion of the Work in the schedule of values, less re[ainage of Ten percent <br />- 10.0096 ). P~n~.ittg final determination of cost to the Owner of changes in the Work, amounts not in <br />dispute yhiitl included as provided in Section 7.3.8 of AIA Document A201-1997; <br />.2 t Add that portion of the Contract Sum properly allocable to materials and equipment delivered and <br />-suitably stored a[ the site for subsequent incorporation in the completed construction (or, if approved <br />lri advance by the Owner, suitably stored off the site at a location agreed upon in writing), less <br />tetainage of Ten percent (10.00% ); <br />a - Subtract the aggregate of previous payments made by the Owner; and <br />A -'. Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment <br />asprovided in Section 9.5 of AIA Document A201-1997. <br />§ 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under <br />the following circumstances: <br />AIA Document A101TM -1997. Copyright ®1915,1918, 1925, 1937, 1951, 1958,1961, 1963, 1967, 1974, 1977, 1987, 1991 antl 1997 by The Amedcan <br />Institute of Architects. All rights reserved. WARNING: This AIAe Document Is protectetl by U.S. Copyright Law and International Trestles. Unauthorized 3 <br />reproduction or dishlbutfon of this AIAS Document, or any portion of It, may result In severe civil and criminal penalties, antl will be prosecuted to the <br />maximum extent possible under the lew. This document was produced by AIA software at 13:18:22 on 09/04/2007 under Ordar No.1000315944_7 which <br />expires on 8/12/2008, and is not for resale. <br />Units Price ($ 0.00) <br />ns for Payment submitted [o the Architect by the Contractor and Certificates for <br />:ct, the Owner shall make progress payments on account of the Contract Sum to the <br />and elsewhere in the Contract Documents. <br />Id covered byeach Application for Payment shall be one calendaz month ending on the last day of <br />follows: -! <br />that ati~Ap~lication for Payment is received by the Architect not later than the Twenty-fifth day of <br />mer shall makepayment to the Contractor no[ later than the Twenty-fifh day of the following <br />plie6fion'for Payment is received by the Architect after the application date fixed above, payment <br />~ the-Owner notdater than Thirty (30) days after [he Architect receives the Application for <br />User Notes: ~ ~ ^ (2065098059) <br />
The URL can be used to link to this page
Your browser does not support the video tag.