My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2007 09 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2007
>
AG 2007 09 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:18:22 PM
Creation date
11/27/2017 11:31:39 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
9/18/2007
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t~+ (~tietdred Fifty Calendar Lays <br />~ 9.3 The Contractor shall achieve Substantial Completion of the entire Work not later than 150 days from the date <br />~` "7 '~ a pa ontractor the Contract Sum in current funds for the Contractor's performance of the <br />o% ~e pct 11 be Five Hundred and Three Thousand. Four Hundred Fifty Six Dollazs <br />: a* ~'~$ b)e lions and deductions as provided in the Contract Documents. <br />t <br />' ~ ~ _ ~ , <br />~ ~'~ ~ ~ ~'~ o `- x~d S[ora a Buildin Add Ei ht Thousand Dollazs 8 000 . <br />x~ ~~ ~f <br />r- - <br />'t ~ ~ ` <br />F t;- ,ems„, _ t ~, <br />Xi ie~ ,. <br />YM ~ y z 1 <br />~ r ided t #q afion for Payment is received by the Architect not later than the Twenty-fifth day of <br />~"~ ~~ ~ hth: the 1{~ ' e pa , ant the Contractor not later than the Twenty-fifth day of the followine <br />r )~~' _ k.t I ~ `th If ¢$Si~r Pay ' " ceived by the Architect after the application date fixed above, payment <br />1 by the caner nit Thir (3~ days after the Architect receives the Application for <br />~ ~;. ym _s'' .... <br />wifl /,, r-e~.~ <br />"t r e t Contract Sum properly allocable to completed Work as determined by <br />" ~ ' , ~multiin th .percentage completion of each portion of the W ork by the share of the Contract Sum <br />all . ortion of the Work in the schedule of values, less retainage of Ten percent <br />- X10. mal determination of cost to the Owner of changes in the Work, amounts not in <br />~~ dispu dad as provided in Section 73.8 of AIA Document A201-1997; <br />,~ I t portion of [he Contract Sum properly allocable [o materials and equipment delivered and <br />a tored,at the site for subsequent incorporation in the completed construction (or, if approved <br />' . ''^,' <br />E ,~ by the Owner, suitably stored off the site at a location agreed upon in writing), less <br />~~ ~ retainage of Ten percent (10.00% ); <br />~~~,, ~ ` <br />~ '- 0% ,per arfnum <br />#~,~ , . i <br />PAGE5 <br />Scott L. Brown. PE <br />BP Barber and Associates. Inc. <br />Atltlitlone end Deletions Report for MIA Document A701 TM -1887. Copyrl8ht ®1915, 1918, 1825, 1937, 1951, 1959, 1981, 1983, 19fi7, 1974, 1977, 1887, <br />1991 end 1987 by The American Instil to of Architects. All rights reserved. WARNING: Thla AIAs Document le protected by U.S. Copyright Law entl <br />Internetlonal Trestles. Unauthorizert reproduction or dletributlan o1 [his AIA°i Document, or any portion of it, may result in severe civil entl criminal <br />peneltles, entl will be prosecuted to`tha maximum extent possible under the law. This document was produced by AIA software et 13:18:22 on 09/04/2007 <br />uMer Order No.1000315944 1 which gxplree on 9112/2009, and le not far resale. <br />User NOtee: (2085089059) <br />~~ <br />