My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 02 20
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 02 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2006 9:20:15 AM
Creation date
11/27/2017 11:32:29 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/20/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />December 5, 2005 (Work Session) <br /> <br />lQ) L~~\F U <br /> <br />page <br /> <br />428 <br /> <br />was not appropriate for downtown Concord. Mr. McDonald said a group <br />consisting of engineers, architects and others had developed a concept to <br />address the Jail project from an urban design standpoint. He also addressed <br />the importance of developing the vacant corner at Corban and Union and stated <br />the desire to open the door for further communications with the Board. <br /> <br />Erik A. Olson, resident of 70 Washington Lane, addressed the Board <br />regarding the Jail project. He stated that Citizens for a Better Concord <br />(CBC) , an advocacy group comprised of local residents and business owners, is <br />committed to finding a workable solution to the Jail overcrowding issues <br />facing Cabarrus County. Further, he said CBC maintains that the Concord <br />Historic District should remain the county seat for Cabarrus County, and <br />endorses the maintenance and development of facilities and services <br />proportionate to the needs of the population. However, CBC opposes the <br />location of one or two 72-foot high, one acre footprint inmate housing <br />complexes wi thin residential areas of Cabarrus County. Mr. Olson presented <br />the following proposal by CBC to construct a Sheriff's Office, Public Safety <br />Center and Inmate Housing Facility along the existing commercial corridor of <br />Corban Avenue under the following conditions: <br /> <br />Construction must be confined to a site roughly described as between <br />Union Street South to Foard Avenue SW, Corban Avenue to McCachern <br />Boulevard SE (estimated total 180,500 square feet); <br />Total inmate population within the new construction must be held to 250 <br />detainees or less (along with the possibility of upfitting the existing <br />Jail to provide space for up to 100 detainees); <br />Finished height of new construction must be limited to 40 feet above <br />existing grade or three stories; <br />Whenever possible, service and mechanical areas should be situated <br />below grade; <br />Cabarrus County stakeholder groups who express <br />Residents for Historic Concord (RHC) , Concord <br />Corporation (CDDC) must be included in project <br />intervals through a designated representative; <br />Cabarrus County must provide, in a commonly accessible public space, a <br />comprehensive project kiosk, to include: scaled plan and elevation <br />renderings; scale model of site and abutting properties; continued, <br />timely access to pertinent project details in print and digital <br />formats. <br /> <br />interest <br />Downtown <br />briefings <br /> <br />(e.g, CBC, <br />Development <br />at regular <br /> <br />In addition, Mr. Olson stated that CBC further suggests that Cabarrus County <br />and the City of Concord also make the following considerations: <br /> <br />Integrate the corner property located at Union Street South and Corban <br />Avenue into the larger project with a multi-fa~ade, retail-themed <br />building limited to 40 feet above existing grade or three stories <br />(estimated 24,460 square feet); <br />Study and consider benefits of integrating The Tribune building into <br />the larger proj ect: retrofitting and conserving the historic fa~ade; <br />reconfiguring interior space as necessary (estimated 5,600 square feet <br />per floor); <br />Cabarrus County should investigate, purchase and appropriately zone a <br />future remote site suited to housing a larger population (based upon 25 <br />year estimates and beyond) . <br /> <br />Margaret Pearson, <br />responded to questions <br />currently proposed for <br />structures that could be <br />conditional use permit. <br /> <br />Director of Development for the City of Concord, <br />regarding the center city zoning of the property <br />the Jail project. She commented on the types of <br />built on the property and those that would require a <br /> <br />Frances Gallimore reported that Dr. Patrick Quinn, a member of the CBC, <br />would be meeting with the judges about the possibility of instituting other <br />programs that could help reduce the Jail population. These included adult <br />drug court, juvenile drug court and a pre-trial release program. She stated <br />these programs may reduce the number of beds required in the Jail. <br /> <br />There was lengthy discussion by the Board regarding the Jail proj ect <br />and the proposal presented by CBC. Items addressed during the discussion <br />incl uded the following: (1) Current average j ail population of 220 versus <br />the 250 beds proposed by CBC for the new structure; (2) Future involvement of <br />the open Space Urban Design Institute; (3) Decisions made concerning the Jail <br />project since 2002; (4) Previous consideration by the Board of the pre-trial <br />release program; (5) Al ternati ves suggested by the State Jail Inspector to <br /> <br />f'" ..~ <br />.~.). ...." <br />I -.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.