My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 05 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 05 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2006 11:07:31 AM
Creation date
11/27/2017 11:33:00 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/15/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />(Section 9.8.5 of AlA Document A20J-J997 requires release of applicable retainage upon Substantial <br />Completion of Work with consent of surety, ifany.) <br /> <br />Add, if final completion of the Work is thereafter materially delayed through no fault of the <br />Contractor, any additional amounts payable in accordance with Section 9.10.3 of AlA Document <br />A201-1997. <br /> <br />Reduction or limitation of retainage, if any, shall be as follows: <br />is intended, prio ubstantial Completion of the entire Work, to reduce or limit the retainage resulting from <br />ercent inse Sections 5.1.6.1 and 5.1.6.2 above. and this is not explained elsewhere in the Contract <br />uments isions for such reduction or limitation.) <br /> <br />prior approval, the Contractor shall not make advance payments to suppliers for <br />ve not been delivered and stored at the site. <br /> <br />ng the entire onpaid balance of the Contract Sum, shall be made by the Owner to the <br /> <br />fully performed the Contract except for the Contractor's responsibility to correct <br />in Section 12.2.2 of AlA Document A20 1-1997, and to satisfy other requirements, <br />d beyond final payment; and <br /> <br />for Payment has been issued by the Architect. <br /> <br />nt to the Contractor shall be made no later than 30 days after the issuance of the <br />r Payment, or as follows: <br /> <br />N <br />the Owner or the Contractor as provided in Article 14 of AIA Document <br /> <br />e Owner as provided in Article 14 of AlA Document A20 1-1997. <br /> <br />reed upon, if any.) <br /> <br />equirements under the Federal Truth in Lending Act, similar state and local consumer credit laws <br />ons at the Owner's and Contractor's principal places afbusiness, the location afthe Project and <br />ct the validity of this provision. Legal advice should be obtained with respect to deletions or <br />modifications, and also regarding requirements such as written disclosures or waivers.} <br /> <br />~ 7.3 The Owner's representative is: <br />(Name, address and other information) <br /> <br />AlA Document A10pM-1997. Copyright @1915, 1918, 1925. 1937. 1951, 1958, 1961, 1963. 1967, 1974, 1977. 1987, 1991 and 1997 by The American <br />Institute of Architects. All rights reserved. WARNING: This ArA~ Document Is protected by U.S. Copyright Law and Internatlonal Treaties. Unauthorized 4 <br />reproduction or distribution 01 this AIA4- Document, or any portion 01 It. may result in severe civil and criminal penalties, and will be prosecuted to the <br />maximum extent pOSSible under the law. This document was produced by AlA software at 08:54:20 on 05/03/2006 under Order No.l000217185_1 which <br />expires on 1/2312007, and Is not lor resale. <br />User Notes: (854456936) <br /> <br />G-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.