Laserfiche WebLink
<br />Rowan-Cabarrus Community College <br />Building 3000 Construction Bid Analysis: <br />5-1-06 <br /> Amount Amount <br />State <br />Bond $4,287,029 <br />Local: Cabarrus $3.565.141 <br /> $7,852,170 <br />Less: <br />Architect Fees $530,662 <br />Testing, Geotech, <br />etc $70,000 <br />Architect, etc. $600.662 <br />Available for Project $7,251,509 <br />Less: <br />Contingency $222,195 <br />Furnishings $1.000.000 <br />Total Set Aside: $1 ,222,195 <br />Total for Project <br />Less Archtect & <br />Set <br />Aside $6,029,314 <br /> <br />Low Multi-Prime Bidder: Ules COnstruction + 3 MEP Primes <br /> <br /> m51 gm Multl-Primes <br />Base $6,318,270 $288,956 General: G.W. Ules Constr. Co. <br />Alt 1 Parking $129,200 Plumbing: L T Mechanical <br />Alt2 Commons Area $26,000 Meehan: Southern Comfort of Charlotte <br />Alt3 Kitchen Equip. $90,104 Electrical: Progress Electric Co. <br />A1t4 Cafeteria COunters $54,000 <br />Alt5 HVAC Controls $0 <br />Alt6 Awning Fabric $7,500 <br />Alt7 Locks !Q <br /> $6,625,074 $595,760 <br /> <br />&-\0 <br />