My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 09 25 Regular
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 09 25 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:17:14 PM
Creation date
11/27/2017 11:33:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
9/25/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cabarrus Countv Shetirrs Department and Detention Center <br />GMP #1 (Jail Annex) . <br /> <br />Chanee Order Rellue~t #1 <br />Due to conditions in th~ field, our state erosion control inspector required additional <br />landscaping fabric to be placed in the Sediment Basin # 1. <br /> <br />Total - $954.97 <br /> <br />Chanee Order Rellue~t#3 <br />City of Concord Engin~ering Department has required a Seepage Trench to be designed <br />and constructed to provide for additional erosion control measures should their be a <br />breach in Sediment Basin #2. <br /> <br />Total- $27,367.31 <br /> <br />Chanee Order Relluest #4 <br />City of Concord Fire Department has required vehicular access to all sides of the housing <br />facility. An approved retaining wall has to be redesigned and extended an additional 98 <br />feet. This wall is necessary to support the construction of the new access/maintenance <br />road. <br /> <br />Total - $64,601.90 <br /> <br />Chanee Order Rellue~t #5 <br />Trigon Engineering, our independent engineer, noted some unsuitable soils in an area that <br />will be supporting a large storm drain pipe. These soils had to be removed and replaced <br />with soils that can sup~ort the weight of the pipe and avoid maintenance problems in the <br />future. <br /> <br />Totai - $1,053.56 <br /> <br />Chanee Order Rellue~t #7 <br />Due to a pre-existing f$lure of the stormwater collection system that extends along our <br />rear property line, ther~ is an area that is not draining properly and as a result is allowing <br />water to pool and ultim~tely deposit sediment on an adjacent property. In order to correct <br />this problem, the state ~rosion control inspector has required the replacement of the <br />manhole at this locatio~ and the repair of the existing pipes leading into the manhole. <br /> <br />Total- $8,382.79 <br /> <br />F,JI <br />
The URL can be used to link to this page
Your browser does not support the video tag.