My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 09 25 Regular
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 09 25 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:17:14 PM
Creation date
11/27/2017 11:33:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
9/25/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 1 ot 1 <br /> <br />Simaan, Leila E. - (CHA) <br /> <br />From: David Russell [drussell@hallcontracting.com] <br />Sent: Wednesday. July 26,20068:25 AM <br />To: Simaan, Leila E. - (CHA) <br />Cc: Andrew, lain J - (CHA) <br /> <br />Leila, <br /> <br /># <br /> <br />IPCO <br />D \ ~__- <br /> <br />Please discard my previous price sent via email on 7/25/06. <br /> <br />Hall Contracting requests a change order in the amount of $19.551 be issued for the installation of the seepage <br />trench as shown in details 1.2. & 3 of sheet C-7.3. <br /> <br />Keep in mind that this trench is 11 feet deep and down at the bottom of the site. We have to dig it. lay 3' of sand, <br />drop in the pipe, haul in 132 Cy of sand and get it to the back of the site. <br />C I arifi cations/Exception s: <br />1. Excess dirt to be disposed of off site. <br />2. Price does not include a filter sock around the 4" slotted pipe to prevent silt from entering the pipe. <br />3. Price does not include the handling of rock. unsuitable soils. or trash and debris. <br />4. The backfill between this trench and MH-B2 is will the existing dirt, not sand. <br /> <br />Labor = $5.836 <br />Equipment, hauling, fuel...= $10,168 <br />Permanent materials = $3.353 <br />Bond=$194 <br /> <br />This price needs to be approved prior to the installation of the RCP between OS-B3 and MH-B2. Failure to <br />approve quickly will delay the completion of basin #2 which will delay the site grading and Annex work. <br /> <br />Thanks, <br />David <br /> <br />-.-...---.. . <br /> <br />1 _" "_.\._.1 <br /> <br />',--",. "~'~.Y"', "_-":\, '. l'>>- ' t <br />- -. -'1 :::~, . S 'j <br /> <br />......... -- <br />, ' \) - <br />:,' i,._ . -; <br /> <br />( IJ~-f <br />\, _~ i_., ,~ <br /> <br />, <br />'.~ l~ 'L ~~.,.~ .~: \ <br /> <br />F-dJ <br /> <br />7/26/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.