Laserfiche WebLink
<br />.1 u.bC 1 Vi 1 <br /> <br />Simaan, Leila E. - (CHA) <br /> <br />From: David Russell [drussell@hallcontracting.comj <br />Sent: Monday, August 28, 2006 3:22 PM <br />To: Simaan, Leila E. - (CHA) <br />Cc: Andrew. lain J - (CHA); Jeff Haddix <br />Subject: Cost to rebuild 01-B1 <br /> <br />Leila, <br /> <br /># <br /> <br />pea <br />Od~ <br /> <br />The total cost to rebuild 01-B1 is $6.674. <br /> <br />Labor $2,713 <br />Petmanent materials $2.592 <br />Equipment $1 ,302 <br />Bond $67 <br /> <br />Clarification / Exclusions <br /> <br />1. Muck out the area and backfill with stone to allow the casting of a new drop inlet base. <br />2. Properly dispose old masonry structure off site. <br />3. Rebuild masonry drop inlet to accept the 18" and 3D" RCP inlet pipes and one 18" RCP outlet. <br />4. Backfill to top of pipes with stone. <br />5. Backfill to top of dtop inlet with acceptable fill dirt. <br />6. The immediate area to be seed. strawed & covered with jute mesh / erosion control mat. <br />7. Protect Hie structure inlet with silt fence until the area is stabilized. <br />8. Hall not responsible for damage to area caused by surface or under ground water. <br />9. Due the size of the inlet structure to frame & grate will be cast into the concrete lid. <br />10. Price excludes all wotk not specifically described within this emai!. <br /> <br />Thanks, <br />David <br /> <br />F-;)... <br /> <br />8/28/2006 <br />