My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2006 09 25 Regular
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2006
>
AG 2006 09 25 Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2009 12:17:14 PM
Creation date
11/27/2017 11:33:55 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Minutes
Meeting Minutes - Date
9/25/2006
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.1 u.bC 1 Vi 1 <br /> <br />Simaan, Leila E. - (CHA) <br /> <br />From: David Russell [drussell@hallcontracting.comj <br />Sent: Monday, August 28, 2006 3:22 PM <br />To: Simaan, Leila E. - (CHA) <br />Cc: Andrew. lain J - (CHA); Jeff Haddix <br />Subject: Cost to rebuild 01-B1 <br /> <br />Leila, <br /> <br /># <br /> <br />pea <br />Od~ <br /> <br />The total cost to rebuild 01-B1 is $6.674. <br /> <br />Labor $2,713 <br />Petmanent materials $2.592 <br />Equipment $1 ,302 <br />Bond $67 <br /> <br />Clarification / Exclusions <br /> <br />1. Muck out the area and backfill with stone to allow the casting of a new drop inlet base. <br />2. Properly dispose old masonry structure off site. <br />3. Rebuild masonry drop inlet to accept the 18" and 3D" RCP inlet pipes and one 18" RCP outlet. <br />4. Backfill to top of pipes with stone. <br />5. Backfill to top of dtop inlet with acceptable fill dirt. <br />6. The immediate area to be seed. strawed & covered with jute mesh / erosion control mat. <br />7. Protect Hie structure inlet with silt fence until the area is stabilized. <br />8. Hall not responsible for damage to area caused by surface or under ground water. <br />9. Due the size of the inlet structure to frame & grate will be cast into the concrete lid. <br />10. Price excludes all wotk not specifically described within this emai!. <br /> <br />Thanks, <br />David <br /> <br />F-;)... <br /> <br />8/28/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.