<br />09-05-Z006 14:Z7 <br /> <br />FROM- <br /> <br />T-553 P.004/005 F-a19 <br /> <br />.......-....---- <br /> <br />I <br /> <br />i <br /> <br />Page Lo <br /> <br />I <br /> <br /> <br />D.) When the "F1bi:r Optic Cable" 100 foot Right of Way was discovered. the planned erosion controljbasin <br />in Phase 1 could not be installed untilloc:ation of the "Fiber Optic Cable" 100 foot Right of Way ~ <br />loC$:d on the site and redesign of the plan WllS compl~ to allow ittstal1alicn of the pc:rmanc:nt ~t <br />pond A, so on June 16, 2006, a tempomy erosion control basin \-vas installed inside Phase 11 <br />and above the "Fiber Optic Cable" 100 foot Right of Way as follows: I <br />Cat 330 Excavator: 6 hours @ $155.00fhollF 5930.00 i <br />Cat 300 Truck: 4 b.our.s @ S14~lOOlhour= $560.00 I <br />Ri-p Rap Stone: 37.31 tons @ $2S.001ton-= $932.75 i <br />#57 Washed Stone: 19.02 tollS@S22.001ton=$418.44 . <br /> <br />Te1Ilporary Erosion CODtrol Ba&iD Add 52,841.19 <br /> <br />E.) TIll: 1'eVised plan fur "sediment1'ond N' changed the CMP riser pipe and the C1...'tlet pipe from lS"ito 24" <br />diameter CMP pipe. The previous plan riser and outlet pipe wm: defrveNQ. Olll!ite, so the crvnr riser <br />pipe was retumed and revised and additional 24" CMP was delivered for a net additiOllal ~tl}fJ <br />S3,251.Z7 <br /> <br />F.) The garbage was undercut m::m the new roadway and bau1ed:tint to BFJ. ilien to "Rowan Count:'! J-anciiill. <br />Cull' Brothers, Inc. loii.derl the trucks llIJd. hauled the garbage to the landfills as follow:!: <br />Car 330 Trackhce: 31 Jrrs.@ S155/h:c= $4.805.00 <br />Laborer: 31 m. @ S301hr.= 3930.00 <br />Tandem Dump TrUck: 111 hrs. @ SS6/br= $6,216.00 <br />TriaxleDmnp Truck: 198.5 hrs. @$581.br.= 311,513.00 <br />Quadaxle Dump T.lUCk: 36.5 hrs. @ $Q2/hr.= 32,263.00 <br />Tractor T:tailor Dump '!'ruck: 76.5 hrs. @S68/hr.= $5,2.02.00 <br /> <br />Total Garitage Load &; 1buJ $30,929,00 <br /> <br />The garbage was uodl:tcut and baukd o:ff:rite, then bacldillfld 'wF.h :!Oils from 3 bonow SOlJICl: 1 b-..ile awT'f <br />as follows: 1 <br />Cat DS D02llilr: 15.5 hIs. @ S1601br.= $2,480.00 ; <br />Cal621 Motorscraper. 40 l1rs.@$1701br.'" 56,800.00 <br />Cat 815 Compactor: 15.5 hrs. @S140.00Ihr.... $2, i70.00 <br />CatD7.Dozer: 10 hrs. @Sl45/hr.= $1,450.00 <br />Water Truck: 3 !Irs. @S60Ihr." 3180.00 <br /> <br />-. i <br />, <br />BacJdill with Imported Soils Add $13,080.00 J <br />! <br />Total Garbage Load, T~ Offilite, & Bacldill: $30,9Z9.lilj + S13,98il.llo.. 544,009..,0! <br />. i <br /> <br />I:-~ 3 <br />