<br />-2- <br /> <br />The approved Cox Mill School/Park budget is $1,590,006.00, which includes <br />$182,996 from project contingency. With the overall low bidder of Mountain Creek <br />Contractors, LLC at $2,095,000, the difference of approved funds is a shortage of <br />project funds in the amount of $504,994.00. By the method of value engineering <br />process, the project bid ~mount was reduced to within the approved funds of <br />$1,590,006.00. The follillwing items were recommended: <br /> <br />· Mobilization (r~duced Bond amount) <br />· Mass Grading (rteduction from grading evaluation) <br />· Slope Matting i~ the areas of reduced slope <br />· 4' Fence around existing Playground (removed) <br />· 5' Screening Tr,.il (removed) <br />· 6' Sidewalk from Existing Parking on the South Side of School <br />· 4' Roadway Fence (removed) <br />· Undercut and Bl1ckfill (removed) <br />· Rock Excavatiol'l (removed) <br />. Haul of Excess i;Jndercut/Rock (removed) <br />· Material Chang,ln Storm Pipe (RCPto HDPE) <br />· 15" Flared End Section (removed) . <br />· 24" Flared End Section (removed) <br />· 48" Flared End Section (removed) <br />· Combination Goal Posts (removed) <br />· Portable Goal Pbst (removed) <br />· Pitching Moun~ (reducedto 1) <br />· Portable Pitching Mound (removed) <br />. 200' Fields - fel!lce, dugouts, concrete (removed) <br />· 300' Fields - ferllce, dugouts, concrete (removed) <br />· T-Ball Field on $occer Field (removed) <br />· Warning Track elm the 300' Field (removed) <br />. Infield Mix (rembved) <br />· Reduction of Soil Amendments <br />· Delete the requ~rernents for screening topsoil <br />Total Reduction <br /> <br />$ 5,000.00 <br />$ 40,000.00 <br />$ 7,000.00 <br />$ 15,000.00 <br />$ 5,000.00 <br />$ 20,000.00 <br />$ 15,000.00 <br />$ 30,000.00 <br />$ 10,000.00 <br />$ 5,000.00 <br />$ 10,000.00 <br />$ 6,000.00 <br />$ 1,800.00 <br />$ 3,000.00 <br />$ 32,500.00 <br />$ 5,500.00 <br />$ 1,333.00 <br />$ 1,500.00 <br />$110,000.00 <br />$ 60,000.00 <br />$ 45,000.00 <br />$ 30,000.00 <br />$ 20,000.00 <br />$ 8,000.00 <br />} 18,361.00 <br />$504/994.00 <br /> <br />* Parks and Recreation Department or other contractors will perform these project <br />elements. (Fencing for playground, roadway and athletic fields, combination <br />football/soccer goal posts, portable goal post, and baseball/softball infield <br />preparation) <br /> <br />~-w. <br />