Laserfiche WebLink
<br />CABARRUS COUNTY JAIL ANNEX <br /> <br />HALL CONTRACTING PROPOSAL REOUEST FORi VI No. 2955-039 <br /> <br />Description of Work: Accelerated Tunnel Schedule <br /> <br />(a) Permanent Materials (Provide itemized breakdown) <br /> <br />$0.00 <br /> <br />(b) Equipment & Consumables (list separately) <br />at rates not in excess of those <br />prevailing in the locality of the project <br /> <br />$36,135.00 <br /> <br />Sub-Total (1) [a + bJ <br /> <br />$36,135.00 <br /> <br />(c) Overhead & Profit (15% x Sub-Total (I) <br />for additive cbanges, -5% for <br />deductive changes) <br /> <br />. $5,420.00 <br /> <br />Sub-Total (2) [Subtotal 1 + cJ <br /> <br />$41,555.00 <br /> <br />(d) Labor (Provide itemized breakdown) <br /> <br />$9,277.00 <br /> <br />(e) Overhead & Profit (15% x (d) <br />for additive changes, -5% for <br />deductive changes) <br /> <br />$1,392.00 <br /> <br />Sub-Total (3) [d + eJ <br /> <br />$10,669.00 <br /> <br />(I) Sub-Contract Work (if applicable, <br />same breakdown as shown above) <br /> <br />$8,619.00 <br /> <br />(g) Contractor's Overhead & Profit <br />on Sub-Cost (15% for additive changes, <br />-5% for deductive changes) <br /> <br />$1,293.00 <br /> <br />Sub-Total (4) [f + gj <br /> <br />$9,912.00 <br /> <br />(h) Insurance (excludes Worker's Compensation and <br />General Liability, Social Security or as otherwise <br />required andlor specified) (15% for additive <br />changes, -5% for deductive changes) <br /> <br />$2,226.00 <br /> <br />(i) Overhead & Profit (15% for additive changes, <br />-5% for deductive changes) <br /> <br />$334.00 <br /> <br />Sub-Total (5) [h + IJ <br /> <br />$2,560.00 <br /> <br />0) Guarantee Bond [on Sub-Totals (2) + (3) + (4) + (5)] <br /> <br />$752.00 <br /> <br />(k) TOTAL [Sub-Totals (2) + (3) + (4) + (5) + 0)] <br /> <br />$65,448.00 <br /> <br />Extension of Time Request: 130 calendar days.' <br />* Attach detailed justification. <br /> <br />&-3 <br />