Laserfiche WebLink
<br />(h) <br /> <br />(i) <br /> <br />I I 101 III n~w!lI,) I..JOl.,dlll.. ~l",.JldIIU~~~J <br /> <br />(U4~4UbU~~ <br /> <br />T-01J P OJ3/004 "-249 <br /> <br />CABARRUS COUNTY JAil.. ANNEX <br /> <br />PROPOSAL REQUEST FORM <br /> <br />(<1) <br /> <br />Materials (Provide itemized breakdown) <br /> <br />$290.00 <br /> <br />..' <br /> <br />(b) Rent of Eauinmenr (list seperalcly) <br />~L nlte not in excess of those <br />prevailing in locality of project. <br /> <br /> 1) /),00 <br /> $~nfi.OQ <br /> -'/ <br />, . :/ <br />.'i ./ <br /> .$3 J .00 <br /> $~B7 .00 <br /> ,~270.00 <br /> <br />Sub- Total (1) (a + bJ <br /> <br />(e) Overhead and .Prolil ( J 0% x SuO-tOL1.1 (1) <br />for additive changes, -5% for <br />dedueLivc changes. <br /> <br />Sub-Total (2) [Subtotall-+- c] <br /> <br />(d) labor ( provide itemi;r.ed breakdown) <br /> <br />(e) <br /> <br />Overhead and ProliL (J 5% x Labor jtem (d) <br />For addiLive changes, -59~) for <br />deductive changes) <br /> <br />$40.00 <br /> <br />Sub. Total (3) [d -+- c] <br /> <br />$3] 0.00 <br /> <br />(f) <br /> <br />Sub-Contract Work ( if applicable <br />same breakdown as shown above) <br /> <br />1 <br /> <br />(g) <br /> <br />ContracLors Overhead and' Profit <br />on SUb-CO.sL (5% for additive changl::>, <br />0% for deductive changes) <br /> <br />1 <br /> <br />Sub-Total (4) [f -+- g] <br /> <br />1 <br /> <br />Insurance (Workmen's Compensation, <br />Social Security or as oLhcrv.;ise <br />required and/or specified) <br /> <br />$124,00 <br /> <br />Sub-Total (5) [based on d] <br /> <br />$434.00 <br /> <br />Guarantee Bond ( On Sub-Total (2)+$ub-Tolal (3) <br />Or Sub-ToLal 4 as applicable) <br /> <br />$3.00 <br /> <br />Total <br /> <br />'5779.00 <br /> <br />EXtension of Time Re{jues;ted:_caJ\::nder days'" <br /> <br />* AtL.1Ch det;li led.i ustilicalion. <br /> <br />[:.-2 <br />