Laserfiche WebLink
<br />Simaan, Leila E. . (CHA) <br /> <br />.~Jge <br /> <br />From: David Russell [drussell@hallcontracting.com] <br />Sent: Monday, September 18, 2006 11 :44 AM <br />To: Simaan, Leila E. - (CHA) <br />Cc: 'Jeff Haddix' <br />Subject: Access Road on revised C-3.0 <br /> <br />Leila, <br /> <br />The cost for the stone access road to the pond is $36,884.55. <br /> <br />Labor = $15,501.70 <br />Permanent Materials = $6,453.12 <br />Equipment & Expenses = $14,560.88 <br />Bond = $368.85 <br /> <br />Clarifications/Excf usion s: <br /> <br />:'; <br /> <br />A.s I -if +- <br /> <br />1. Additional area along the west side of the hOUsing will have to be cleared. <br />2. The existing silt fence along the west side of Housing will have to be relocated. <br />3. The grade all along the new road have changed. <br />4. Road base to be 6" compacted ABC stone. <br />). Price excludes any fabric under the stone. <br />6. Overtime wages. <br />7. All work not specifically described within this email. <br /> <br />Thanks. <br />David <br /> <br />9 1 ,\/' nnl, <br /> <br />E-2.. <br />