<br />C. Base Roadway Network <br />All roadways in the vicinity of the development shall be included as part of the TIA. Analysis of <br />intersections or roadway segments not immediately adjacent to the development may be required by the <br />District Engineer or Cabarrus County if significant site traffic could be expected to impact the intersection <br />or roadway segment. If intersections impacted by the development are within a coordinated traffic signal <br />system, then the entire traffic signal system shall be analyzed. However, if the. traffic signal system is large, <br />a sub-section of the system may be analyzed if approved by the District Engineer and agreed upon by <br />Cabarrus County. <br /> <br />D. Safety Information <br />The initial submittal may be required to include recent crash experience in the study area. Where proposed <br />access points are in the vicinity of high crash locations or where safety may be impacted, additional safety <br />studies may be required as part of the Traffic Impact Analysis. <br /> <br />E. Traffic Volumes <br />Traffic turning movement counts shall be taken at each existing intersection in the project area. Existing <br />traffic counts may be used if taken within twelve months of the TIA submittal. At some intersections, <br />counts older than one year may be used if adjusted to current year. The use of these older counts will be <br />evaluated on a case-by-case basis by the NCDOT and Cabarrus County and shall be approved by the <br />District Engineer or his or her agent. <br /> <br />In general, AM and PM peak hour counts should be used. Other peak hour period counts, such as lunch and <br />weekend periods, may be required if appropriate for the development. Counts shall not be taken on a <br />holiday unless specifically needed for the particular analysis. The effects of school, seasonal variation and <br />special event traffic shall be noted when appropriate. <br /> <br />F. Traffic Capacity Analysis <br />All capacity analysis shall be performed using methodology and software based on the Highway Capacity <br />Manual procedures or as approved by the NCDOT District Engineer. All software shall be the latest version <br />available unless otherwise approved by the District Engineer. If signalized intersections impacted by the <br />project are within a coordinated traffic signal system, or may be included in a system because of changes to <br />the network by the applicant, then they shall be analyzed as a system rather than as isolated intersections. <br />Where available and appropriate, existing timing information shall be used. All analyses shall include level <br />of service determination for the entire network and individual intersections and roadway segments, as <br />appropriate. Intersection analyses shall include level of service determinations for all approaches and <br />movements. Intersection analyses shall include queue analysis. <br /> <br />G. Growth-to-Background Traffic Volumes <br />Growth-to-background traffic volumes are factors of increases in annual traffic volumes generated outside <br />the project area. These factors shall be applied to the existing traffic before adding any approved <br />developments in the area. As deemed appropriate, the volume shall be compounded to the proposed build- <br />out years or completion of development stages. In general, these factors will be determined from local or <br />statewide data. <br /> <br />. <br /> <br />H. Approved Development Traffic <br />Approved development traffic is defmed as traffic generated by all developments approved by local <br />jurisdictions or submitted to local jurisdictions for approval within the development vicinity at the time of <br />the TIA submittal. <br /> <br />I. Background Analysis <br />Background (no build) analysis shall include existing traffic, traffic signal phasing and timing, background <br />growth, and all approved developments. The analysis shall take into consideration any impi'Ovements to the <br />roadway network that will be in place by the bnild-out year, or staged build-out in development, as <br />appropriate. An analysis shall be performed for each staged build-out year as necessary. 1ms analysis shall <br />be performed for the proposed build-out year of the development or other year as identified by Cabarrus <br />County or NCDOT and approved by the District Engineer. <br /> <br />/:;--/ (a.) <br /> <br />Page 3 of6 <br />