Laserfiche WebLink
<br />Page: 3 <br />BID No. 000000 <br /> <br />BIDDER: <br /> <br />Cost of Three Tower Options <br /> <br />Pricing this way because the FAA determination may not be issued when the bid goes out. <br /> <br />Total Cost of the Tower Installed with Medium Intensity Strobes $ <br /> <br /> <br />Total Cost if Medium Intensity Day and Red Lights Night Light Package is Use $ <br /> <br />Total Cost if Tower is Painted Aviation Orange and White with Red Lights $ <br /> <br /> <br />Tower Materials Only Can be invoiced when shipped. Balance of Cost when project is complete. <br /> <br />C--~ <br />