My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2005 08 15
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2005
>
AG 2005 08 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 8:35:31 AM
Creation date
11/27/2017 11:36:09 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
8/15/2005
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Cabarrus County <br />Law Enforcement Center <br />Contract Amendment #3 <br /> <br />Exhibit A <br /> <br />Scope of Work: <br />Design a new Jail Annex building to be constructed in advance of the LEC on a site <br />adjoining the LEC. The Annex will be connected to the LEC via a corridor that will be <br />built as part of the LEC construction. The tunnel connector to the courthouse will be <br />constructed with the Annex instead of with the LEC as originally planned. Additional <br />work shall include the following: <br />. Demolition of existing buildings at Annex site <br />. Site preparation and development at Annex site <br />. New Jail Annex Building <br />. Connecting corridor to LEC <br />. Modifications to LEC Housing building design to reduce the number of cells <br />Work associated with Hazardous material removal is not included. <br /> <br />Program: <br />Provide approximately 21,000 gsf for one 48-cell housing unit with support space. Cells <br />and dayrooms shall be sized and equipped for double bunking. The Annex building shall <br />be operational while the LEC is under construction. When the LEC is completed, the <br />Annex shall become part of the LEC. . <br /> <br />Budget: <br />Estimated Jail Annex Building Construction: <br />Estimated Demolition & Sitework: <br />Subtotal Annex Building: <br />Estimated Tunnel Connector: <br />Subtotal: <br />Construction Continaencv - 5% <br />Total Annex Construction Budget <br /> <br />$ 4,200,000 <br />$ 600.000 <br />$ 4,800,000 <br />$ 1.070.000 <br />$ 5,870,000 <br />$ 293.500 <br />$ 6,163,500 <br /> <br />Schedule: <br />Schematic Design 1 month <br />Design Development 2 months <br />Construction Documents 2 months <br />Bid/Award 2-3 months' <br />Construction Administration 12 months <br />, Subject to NC DFS review and approval <br /> <br />Owner shall furnish the following: <br />Topographic Survey <br />Environmental Survey <br />Geotechnical Engineering <br />Materials testing (during construction) <br /> <br />Ware Bonsall Architects, Ine. <br /> <br />~-t.o <br /> <br />lof2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.