Laserfiche WebLink
<br />.. . <br />. . -t <br />...;,r . <br />. . . <br />-..... <br />..... <br />. . <br /> <br />03, 05 02: 27p <br />,I J" <br />/-1++1 \ . 0 "' ' <br /> <br />p.l <br /> <br />. "- <br />00.. vj <br />I <br /> <br /> <br />PORTRAIT <br />HOMES <br /> <br />....7 (~, C( _ <'l7 "('. ,,<) "'j 0 <br />c. j-. i,;;;/ t:, 0" . <br /> <br />September 28, 2005 <br /> <br />VIA E-Mail <br /> <br />Mr. Joe Sides <br />Assistant Director .of Facilities & Operations <br />Cabarrus County Schools' <br />4425 Old Airport Road <br />Concord, NC 28026 <br /> <br />Re: Clover Road Elementary School <br /> <br />Dear Mr. Sides: <br /> <br />Pursuant to our meeting 0(15 September 2005, Portrait Homes - North Carolina, LLC <br />hereby submits it proposal to sell approximately 16 acres Vltith infrastructure improvements, as <br />, shown on the plans prepared by Turnbull Sigmon Design and outlined below: <br /> <br />Drawings: <br />Schematic Grading Plan "B," dated 7/05/2005 and revised 8/22/2005, with redline <br />changes from MEAJ and bearing the handwritten date of 9/23/05 <br /> <br />Scope of Work: <br />I. Clear and grade site to include erosion control. <br />2. Install all required on site storm sewer outside ofbuilding pad. <br />3. Install required water main to the building and capped off. <br />4. Install required sanitary sewer to the building pad and capped off. <br />5. Install standard curb and gutter and concrete walks outside of the building pad. <br />6. Install asphalt paving, including striping and stone access drive. <br />7. Install retaining walls outside of building pad, as shown on plans. <br />8. Seed and straw all dishtrbed areas outside of building pad. <br />9. Staking of work and testing as required by local building codes. <br />10. All off site road improvements. <br /> <br />Qualifications and Exclusions: <br /> <br />1. This proposal is for the sale of school site with completed infrastructure, as <br />des,cribed above. <br />2. Building pad will be delivered to building contractor 125 days after all approvals <br />to commence work have been received and <br /> <br />;;1:; \l'-'!j!",',' L:,,::.i, ~~...:': l~"': '" 1':I.!lol.~il". "<i ._ "1 <br /> <br />:i::' j...: <br /> <br />: ,'I; l ~ :':. :'.J. ""'. ~ .::", i';1 :'. <br /> <br />G.cS <br />