Laserfiche WebLink
~atehing Inunfiw Grant $~ring System, Page <br /> Year 2004 - 2005 <br /> <br />6, a) This project has architectural or design drawings and cost estimates. Yes ~ No ~ <br />(5 points) <br />b) The architectural and/or design plans are signed and attached. Yes No ~ <br />(3 points) <br />c) All utilities are identified on drawings/maps. (3 points) Yes No <br />d) This project has a description/narrative and cost estimates. (3,points) Yes No ~ <br />7. a) This project does not duplicate existing public facilities. (3 points) Yes ~ No <br />b) This project is part of a multi-year plan to develop the facility. (3 points) <br /> Yes No ~ <br />c) This project is suitable to the land and conforms to the Livable <br />Community Blueprint. (3 points) Yes No ~ <br />8. a) This project was presented to the organizational governing body. (3 points) Yes No ~ <br />b) This project was presented to the organization/community as a whole. (3 points) Yes .~ No ~ <br />(~Attach minutes of meetings.) <br />9. a) The application is signed by the Principal/Mayor/Manager, (1 point) Yes ~ No <br />b) The application is signed by the Director of Facilities, Operations, and Yes No ~ <br />Construction/Director of Business Operations, Cabarrus County & Kannapolis City <br />Schools (if applicable) <br />(1 point) <br />10. a) All forms were attached, signed, and on time. (1 point) Yes No ~ <br />b) Applicant attended Grant Workshop. (5 points) Yes No ~ <br /> <br /> <br />