Laserfiche WebLink
Memo <br /> <br />To: <br /> <br />Frorm <br /> <br />CC: <br /> <br />Date: <br /> <br />Re: <br /> <br />Board of Commissioners <br /> <br />Jonathan Marshall, Commerce Directo <br /> <br />John Day, County Manager <br /> <br />05/17/04 <br /> <br />Construction Standards Permit Fee Schedules <br /> <br />The following items were inadvertently left off the proposed fee schedules: <br /> <br />· ,Schedule A should include a permit fee for new mobile homes of $100.00 <br />· Schedule B should include a callback fee just as the other schedules do <br />· Gas Packs were left off the Mechanical Permit list. <br /> <br />The existing schedules include insulation permits. These permits have been eliminated and the cost <br />absorbed within the general permit cost. <br /> <br />· Page 1 <br /> <br /> <br />