Laserfiche WebLink
10) The Type, locations and dimensions of all proposed and existing landscaping, and <br /> fencing; <br />11) The number, type and design of the Tower(s) and Antenna(s) proposed and the basis for <br /> the calculations of the Tower's capacity to accommodate multiple users; <br />12) The make, model and manufacturer of the Tower and Antenna(s); <br />13) A description of the proposed Tower and Antenna(s) and all related fixtures, structures, <br /> appurtenances and apparatus, including height above pre-existing grade, materials, color <br /> and lighting; <br />14) The frequency, modulation and class of service of radio or other transmitting equipment; <br />15) The actual intended transmission and the maximum effective radiated power of the <br /> Antenna(s); <br />16) Direction of maximum lobes and associated radiation of the Antenna(s); <br />17) Certification that the NIER levels at the proposed site are within the threshold levels <br /> adopted by the FCC; <br />18) Certification that the proposed Antenna(s) will not cause interference with other <br /> telecommunications devices; <br />19) A copy of the FCC license applicable for the intended use of the Wireless <br /> Telecommunications Facilities; <br />20) Certification that a topographic and geomorphologic study and analysis has been <br /> conducted, and that taking into account the subsurface and substrata, and the proposed <br /> drainage plan, that the site ~s adequate to assure the stability of the proposed Wireless <br /> Telecommumcat~ons Facilities on the proposed site. <br /> <br />G) <br /> <br />In the case of a new Tower, the Applicant shall be required to submit a written report <br />demonstrating its meaningful efforts to secure shared use of existing Tower(s) or the use of <br />alternative buildings or other structures within the County. Copies of written requests and <br />responses for shared use shall be provided to the County in the Application, along with any <br />letters of rejection stating the reason for rejection. <br /> <br />H) <br /> <br />The Applicant shall certify that the Telecommunication Facility, foundation and attachments are <br />designed and will be constructed to meet all local, County, State and Federal structural <br />requirements for loads, including wind and ice loads. <br /> <br />I) <br /> <br />The Applicant shall certify that the Wireless Telecommunications Facilities will be effectively <br />grounded and bonded so as to protect persons and property and installed with appropriate surge <br />protectors. <br /> <br />K) The Applicant shall furnish a Visual Impact Assessment, which shall include: <br /> <br />1) A "Zone of Visibility Map" which shall be provided ~n order to determine locations <br /> from which the Tower may be seen. <br /> <br />2) <br /> <br />Pictorial representations of "before and after" views from key viewpoints both inside <br />and outside of the County as may be appropriate, including but not limited to state <br />highways and other major roads; state and local parks; other public lands; historic <br />districts; preserves and historic sites normally open to the public; and from any other <br />location where the site is visible to a large number of visitors, travelers or resxdents. <br />Guidance will be provided, concerning the appropriate key sites at a pre-application <br />meeting. <br /> <br />Last Rewsion: 10/27/03 <br />CMS Confidential & Proprietary <br /> <br />6 <br /> <br /> <br />