My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2004 05 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2004
>
AG 2004 05 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 9:19:36 PM
Creation date
11/27/2017 11:37:54 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
5/17/2004
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*['his wa,'; nloved <br /> <br />~! om ~Jlothe) <br />Iocatmn m the <br />o~ dmance and <br /> <br />WaS llOt chan~¢d <br /> <br />The developer shall bear the cost and the County shall install street siqns at all <br />intersections as shown on the final plat. These signs will be erected only after all <br />road and utility construction has been completed. <br /> <br />Section 55-706. Flood damage prevention <br /> <br />Lots that are subject to flooding shall not be established in subdivisions for the purpose of <br />creating building sites except as herein provided and in accordance with Flood Damage <br />Prevention Ordinance (as .... ~ c,,.~,,~^. ~ ~,~A~ <br /> ,~,,,,., ,,~,.,, ~,~,,,,,., ~,., ,j of Cabarrus County. <br /> <br />Para~naph heachnffs ute <br />heine added to make the <br /> <br />ordinance more readable <br />~md to make o]dmanc¢ <br /> <br /> 1. Flood Determination. If there is any water course of any <br /> type running through or within 150 feet of the property <br /> proposed for subdivision, the prospective subdivider shall <br /> provide evidence to the Planning and Zoning Commission, by <br />making reference to maps prepared by the Federal Emergency Management <br />Agency, that the lots within the subdivision will not be flooded. <br /> <br />:tOO Year Flood Elevation. The prospective subdivider shall make a <br />determination of the crest elevation of a flood of 100 year probable <br />frequency in accordance with generally accepted engineering practice. This <br />determination must reflect the actual conditions imposed by the completed <br />subdivision, and must give due consideration to the effects of urbanization <br />and obstructions. <br /> <br />No proposed building lot shown that is wholly subject to flooding <br />shall be approved. <br /> <br />No proposed building lot that is partially subject to flooding shall be <br />approved, unless there is established on the lot plan a line <br />representing an actual contour at an elevation two (2) foot above the <br />100 year flood. Such line shall be known and identified on the lot <br />plan or the "building restriction flood line". <br /> <br />All buildings or structures designed or intended for use shall be <br />located on such a lot so that the lowest usable and functional part of <br />the structure shall not be below the elevation of building restriction <br />flood line. Usable and functional part of the structure is defined as <br />being inclusive of living areas, basements, sunken dens, utility <br />rooms, attached carports and mechanical appurtenances such as <br />furnaces, air conditioners, water pumps, electrical conduits and <br /> <br />25~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.