Laserfiche WebLink
Kassie Goodson <br /> <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br /> <br />Van Rowell'[vrowell@wsacc.org] <br />Fnday, May 07, 2004 4:35 PM <br />Kassie Goodson <br />'Jeff Davis'; 'Jan Sellers' <br />Preliminary Subdivision Plat - Landon Subd~wsion <br /> <br />Kassie, this is response to your request for comments on the proposed Landon subdivision <br />preliminary plat. It is our understanding that the preliminary plat will be presented at <br />an upcoming Harrisburg Planning and Zoning Board meeting. <br /> <br />In general adequate wastewater transportation and treatment facilities are currently <br />available to serve this proposed subdivision. The followings comments are provided for <br />your information: <br /> <br />* Retail sewer service for this proposed subdivision will be provided by the Town of <br />Harrisburg. The wastewater generated from this proposed project will discharge to the <br />WSACC Rocky River Interceptor through the Town's collection system. The Water and Sewer <br />Authority of Cab~rrus County (WSACC) <br />has reviewed the subject project for Adequate Public Facilities. At this <br />time both treatment and transportation capacities are available for the proposed <br />subdivision. <br />* At this time flow acceptance is granted in the order received assuming sufficient <br />wastewater treatment and transportation capacity is available or is reasonably expected to <br />be made available. Currently, WSACC is granting flow acceptance to projects that <br />discharge wastewater to the transmission system serving this area. However, this memo <br />does not guarantee wastewater flow acceptance for the proposed project. Following <br />approval of final site/civil construction plans, flow acceptance must be requested by the <br />Jurisdiction providing the retail sewer service. Flow acceptance is granted in the order <br />that they are received if sufficient wastewater treatment and transportation capacity is <br />available or is reasonably expected to be available. <br />* Please note that the WSACC Capital Recovery fee (CRF) is required for each residential <br />dwelling. The fee is collected at the time the building permit is issued and is separate <br />and not a part of any connection or tap fees required by the Jurisdictional retail sewer <br />provider. <br />* Please note that any rezonings that increase allowable density were not accounted for <br />during design of the exisinting wastewater treatment and transportation facilities. <br />Design was based on existing zoning at the time that design was performed. Therefore, <br />density increases and the resulting increased wastewater flow rates may present capacity <br />problems in the future for wastewater treatment and transportation facilities. Please let <br />me know if you have any questions. <br /> <br />Van Rowell <br />vrowell®wsacc.org <br />WSACC <br />704/786-1783 (ext 19) <br /> <br /> <br />