My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2004 07 26
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2004
>
AG 2004 07 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 9:20:03 PM
Creation date
11/27/2017 11:38:35 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
7/26/2004
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL PERMITS <br /> <br /> UNIT/FIXTURE DESCRIPTION <br /> <br /> A/C Units - 1 hp to 5 hp <br /> Greater than 5 hp constitutes and additional unit <br /> <br /> Heating Units - 0 to 150,000 btu <br /> Greater than 150,000 btu constitutes an additional unit <br /> <br /> Gas Piping <br /> <br /> Boilers (150,000) <br /> <br /> Thru-wall heating and cooling units <br /> <br /> Wall furnace, Floor furnace, and Unit Heaters <br /> <br /> Commercial Exhaust Hoods <br /> <br />Commercial Dryers <br /> <br />Replace Heating 0 (150,000-5t) (no duct work) <br /> <br />Coohng <br /> <br />Fan Coil (Heating and/or Cooling) <br /> <br />Conversion Burner (150,000) <br /> <br />Refrigeration <br /> <br />Duct Work <br /> <br />Replace heat <br /> <br />Replace air <br /> <br />FEES <br /> <br />$35.00 <br /> <br />$35.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$50.00 <br />$50.00 <br />$25.00 <br />$25.00 <br />$25.00 <br />$25.O0 <br />$5o.00 <br />$25.00 <br />$25.00 <br />$25.00 <br /> <br />There will be a $50.00 callback or re-inspecbon fee charged for any return trip to a job site if the <br />contractor, subcontractor, or owner is at fault. <br /> <br />All commercial mechamcal permits for new construcbon or new proiects shall be calculated using <br />the Construction Schedule A, when BTUs (tons) are not applicable. When BTUs (tons) are <br />applicable, the Mechanical Permit fee schedule shall apply' <br /> <br />All commercial mechanical permits for existing buddin(~s, or for prelects where any previous <br />construcbon has occurred, or for the alteration, demolibon, remodel, removal, repair, re-roofing, <br />upfit, or reconstruction of any commercial structure or proiect, shall be calculated using th~, <br />Construction Schedule B. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.