Laserfiche WebLink
<br />SUMMARY OF CHANGE ORDER G-3 <br /> <br />1. Furnish and install revisions to road work. See proposal <br />1C dated 1/17/2003, attached herein. <br />Furnish and install revisions to connecting corridor. <br />See proposal 3C dated 01/13/2004, attached herein. <br />Furnish core drilled openings in exist. concrete <br />beam for sprinkler head installation. See proposal <br />6C dated 02/25/2004, attached herein. <br />Demolish concrete and install new concrete footing in <br />existing building. Remove existing unit vents and replace <br />with glass at exterior windows. See proposal 7C dated <br />04/27/2004, attached herein. <br />Furnish and install additional undercut and replacement of <br />unsuitable soil. See Proposal #9C dated 06/11/2004, <br />attached herein. <br />Furnish and install floor leveler to raise existing floor <br />at renovated area 3/4" to match surrounding area. <br />See Proposal #10C dated 06/11/2004, attached herein. <br />Furnish and install new case work unit as per the <br />Owner's request. See Proposal #11C dated 06/11/2004, <br />attached herein. <br />Furnish and install gypsum wall board furring over masonry <br />in existing renovated areas. See Proposal 12C dated <br />06/14/2004, attached herein. <br />Furnish and install miscellaneous electrical work to <br />Supplement contract documents. See Proposal #13 <br />dated 06/14/2004, attached herein. <br />Furnish and install additional site improvements at Pine <br />Str.eet. See Proposal #14C dated 06.14.2004, attached <br />. herein. <br />Furnish and install four (4) down spouts at retro-fit roof. <br />See Proposal 15C dated 06/18/2004, attached herein. <br />Furnish and install vinyl wall covering in renovated areas <br />in lieu of paint. See proposal16C dated 06/14/2004, <br />attached herein. <br />Furnish and install lay in HVAC grilles in lieu of sidewall <br />grilles in renovated areas. See proposal 17C dated <br />07/09/2004, attached herein. <br />Furnish and install new exhaust fans at roof unfit in lieu of <br />reusing existing fans. See proposal18C dated 07/26/2004, <br />attached herein. <br />Furnish and install ladder access to roof plenum. See proposal <br />19C dated 07/26/2004, attached herein. <br />Furnish and install task lighting in roof plenum and new wiring <br />for exhaust fans. See proposal 20C dated 07/30/2004, attached <br />herein. <br /> <br />,. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />TOTAL ADD <br /> <br />G~ 10 <br /> <br />$109,791.00 <br /> <br />$ 3,619.00 <br /> <br />$ <br /> <br />699.00 <br /> <br />$ 3,298.00 <br /> <br />$ <br /> <br />1,650.00 <br /> <br />$ 2,910.00') <br /> <br />$ <br /> <br />1,048.00 <br />\ <br /> <br />$ 2,640.00 <br /> <br />$ <br /> <br />906.00 <br /> <br />$ 1,492.00 <br />$ 1,066.00 <br />$ 846.00 <br />$ 928.00 <br />$ 3,065.00 <br />$ 4,071.00 <br />$ 1,821.00 <br />$139,850.00 <br />