Laserfiche WebLink
<br />~ <br />~Kœ C4~ ~~~ <br /> <br />!\annapo(ís(ítp ~cbool5 <br /> <br />100 Denver Street <br />KANNAPOLlS, NORTH CAROLINA 28083 <br /> <br />Will Crabtree <br />Finance Officer <br />craot'E'..w@maILkannaoolis k12.nc us <br /> <br />(704) 93S-1131 <br /> <br />FAX. (704) 932-4762 <br /> <br />To: <br /> <br />Pam Dubois, Deputy County Manager <br /> <br />From: <br /> <br />Will Crabtree, Director of Business Operations <br /> <br />Re: <br /> <br />Fred L Wilson /Shady Brook/KMS Change Order <br /> <br />Attached is a change order for Fred L. Wilson Elementary, Shady Brook Elementary, and Kannapolis <br />Middle School. The changes in the scope of work such as additional site work, renovation, and other <br />unforeseen problems have added to the additional cost. The projects and cost attached to each is as <br />follows: <br /> <br />FRED L. WILSON <br />1. $5,350.00 American Contractors: Add concrete steps from the end of the new wing down to <br />playground to ensure safe movement of the children. Connect sidewalk at the street to the frond door <br />of the building for safety and to meet ADA standards. <br />2. $14,339.00 City of Kannapolis: Add sidewalk along property line on Pine Street in order to comply <br />with UDO. . <br />3. $790.00 Playworld Systems: Replace slides for the playground that were damaged' while in stbrage. <br />4. $23,720.00 Larry Ellington: Dismantle, store, and reassemble playground. <br />5. $7,079.00 Graebel: Move contents from old parts of the building to the new wing. <br />6. $4,450.00 The Action Team: Replace picnic shed at the playground. <br />7. $10,000.00 Security Erectors Inc.: Install a sound system in the renovated multi-purpose room. <br />8. $3,000.00 Carolina Siteworks: Remove temporary drive and seed as required. <br />10<6, í\ ~%"ÞO <br />SHADY BROOK <br />1. $380.00 American Contractors: Connect sidewalk from parking lot to building. <br /> <br />KANNAPOLIS MIDDLE <br />1. $2,500.00 Overcash Gravel & Grading: Underground storage tank to feed the sprinkler system. <br /> <br />TOTAL ADDITIONS <br />$71,608.00 <br /> <br />CREDITS <br />1. ($10,161.00) Jarrell Contractors: Credit for Shady Brook. <br />2. ($33,202) Shady Brook Furniture <br />3. ($7,227.00) Shady Brook Engineer <br />¿f 4. . ($21,018.00) gÖtll~i1õè<I~Y îZ..~ u~+ J 0/\ ttd.d l-h f"ro.~ ~~.S' <br /> <br />TOTAL CREDITS <br />$71,6,08.00 <br /> <br />We ask that this change order be approved. If you have any questions please do not hesitate to call me.' <br /> <br />G-'1 <br />