Laserfiche WebLink
<br />SUMMARY OF CHANGE ORDER G.2 <br /> <br />1. <br /> <br />Extend sidewalk at side entrance. See attached proposal dated 04/12/2004. ADD <br /> <br />ADD <br /> <br />2. Revisions to equipment areas. See attached proposal dated 04/01/2004. <br /> <br />3. Add louver to Door 128. See attached proposal dated 04/24/2004. <br /> <br />ADD <br /> <br />4. Connect cafeteria down spouts to storm sewer. See attached proposal dated <br />06/29/2004 ADD <br /> <br />5. Add. a gate at sediment pond fence. See attached proposal dated <br />07/29/2004. <br /> <br />Credit for site work, Le., turning lane, curb and gutter, <br />and sidewalks. See attached proposal dated 07/27/2004 <br /> <br />G~r¡ <br /> <br />ADD <br /> <br />TOTAL ADD <br /> <br />DEDUCT <br /> <br />NET CREDIT <br /> <br />$ 570.00 <br />$ 417.00 <br />$ 175.00 <br />$ 1,262.00 <br />$ 268.00 <br />$2,692.00 <br />(-$12,853.00) <br />(-$10,161.00) <br />0) <br />