My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2004 10 18
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2004
>
AG 2004 10 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2006 9:20:48 PM
Creation date
11/27/2017 11:39:17 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
10/18/2004
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HANSCOM B <br />Faithful&Gould <br /> <br />FIRM PROFILE <br /> <br />Pre-Design <br />Services <br /> <br />Design <br />Services <br /> <br />Site and Building Analyses <br />Phase I - Environmental Study <br />Land Surveys <br />Site Selection Analysis <br />Design Guidelines <br />Inspection Report <br />Utilities <br />ADA Surveys <br />Due Diligence Reports <br />Feasibility Studies <br />Property Valuation <br /> <br />Consents <br />Planning, Zoning <br />Permitting Requirements <br />Utilities: On-Site and Off-Site <br />Access, Traffic, Transit <br />Building Codes <br />Environmental <br /> <br />Selection of Consultants <br />Selection Procedures <br />Selection <br />Contract Negotiations <br /> <br />Design Management <br />Design Document Reviews <br />Energy Analysis <br />Constructability Reviews <br /> <br />Cost Management <br />Budgeting <br />Cost Planning <br />Cost Control <br />Cash Flow Forecasting <br />Estimating <br /> <br />Value Management <br />Value Engineering <br />Life Cycle Cost Analysis <br />Formal Workshops <br />Certified Training <br /> <br />E: ~ t <br /> <br />Statement of User Require- <br />ments (Program) <br />Project Objectives <br />Space Needs <br />Design Standards <br />Project Budget <br />Milestone Schedule <br />Phasing and Sequencing of <br />the Work <br /> <br />Analysis of Development Ap- <br />proach <br />Procurement Strategy <br />Fast-Track <br />Design/Build <br />Contract Packaging and Phas- <br />ing <br />MBE/WBE and Local Partici- <br />pation <br />Market Survey, Le. Availability <br />of <br /> <br />Contractors, Labor and <br />Materials <br />Financing & Lease Back Op- <br />tions <br /> <br />Policies and Procedures Man- <br />ual <br />Administration of Project <br />Cost Control Procedures <br />Value Analyses Procedures <br />Schedule Control <br />Construction Administration <br />Partnering Facilitation <br /> <br />Schedule Management <br />Milestone Schedule <br />Analysis of Construction Shift <br />Requirements <br />Design Schedule <br />Schedule Monitoring and Up- <br />dating <br />Preliminary Construction <br />Analysis <br /> <br />Coordination <br />Coordinate Design and Con- <br />struction <br />Activities <br />Permits and Approvals <br />Periodic Status Reports <br />Agencies Governmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.