My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 01 06 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 01 06 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:04 AM
Creation date
11/27/2017 11:39:58 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/6/2003
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County ,. choots <br /> <br />660 Co~cord Parkway North <br />PO Box 388 <br />Concord, NC 28026.0388 <br /> <br />(704) 786-6195 Ext. 193 <br />(704) 788-1517 Fox <br /> <br />Facilities & Operations Department <br />Joe Sides~ Construction Manager <br /> <br />Date: December 31, 2002 <br /> <br />To: John Day, Interim County Manager <br /> <br />From: Joe'Sides, Construction Manage~~ <br /> <br />Re: Project 'Update Report <br /> <br />Cabarrus County Schools <br /> <br />Bethel Elementary: Grading will be completed by the end of February 2003. Construction <br />documents are finalized and are ready for bidding the project. Cabarrus County has approved the <br />Architect contract (MBAJ 3-26-02), Grading contract (Culp Brothers, Inc. 10-21-02), <br />Engineering services (Qore Property Sciences 10-21-02) and a steel contract (Southern Steel 10- <br />21 =02). Construction contracts can be awarded with funding provided by ~he first of <br />February 2003. Total cost of all contracts is $11.7m. <br /> <br />Pitts School Road Elementary: The Board of Education approved the land contracts on <br />December 30, 2002 for $925,838.58. Cabarrus County approved the Architect contract on 11= <br />18=02. Since the "clone design" is being used the building construction documents are <br />completed. The civil design will be completed around mid-February 2003. Total cost of all <br />contracts, including land, is $12.7m. Construction can begin in April 2003. <br /> <br />*Note: If funding is.provided for Bethel and Pitt simultaneously we will bid the projects as a <br />package. It is our belief that due to the current construction market conditions, this will provide <br />savings on the projects. Depending on the funding, occupancy is scheduled for August 2004. <br /> <br />Cc: Dr. Harold Winkler, Board of Education, Gene Jordan, Don Clickner <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.