My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 01 06 07
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 01 06 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:04 AM
Creation date
11/27/2017 11:39:58 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/6/2003
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table II. APF LEVEL OF SERVICE (LOS) STANDARDS <br /> <br />(A) (S) (C) <br />Public Adopted LOS Standard Impact (D) <br />Facility Criteria Area Availability <br />Water 215 gpd per ERU* Water Treatment Plants Programmed capital improvements <br /> (WTPs) - the service area of may be considered for approval of <br /> *see Table 3 each treatment plant as a rezoning or issuance of a <br /> defined by the operators, preliminary subdivision plat or <br /> preliminary site plan. Only existing <br /> capital improvements may be <br /> considered for issuance of approval <br /> for a final site plan or final <br /> subdivision plat. <br />Sewer 250 gpd per ERU* The service area of each Programmed capital improvements <br /> public treatment plant as may be considered for approval of <br /> defined by WSACC, any a rezoning or issuance of a <br /> package treatment plant or preliminary subdivision plat or <br /> *see Table 3 other wastewater system preliminary site plan. Only existing <br /> serving a proposed capital improvements may be <br /> development considered for issuance of approval <br /> for a final site plan or final <br /> subdivision plat. <br />Streets/ see Table 1 The street lying between the Any programmed capital <br />Roads proposed development and improvements may be considered <br /> the first collector/collector or for approval of a rezoning. <br /> collector/arterial Programmed capital improvements <br /> intersections, within which a within the first three (3) years of <br /> proposed development the Capital Improvements Program <br /> generates traffic of more than and guaranteed by currently <br /> 10 trips per day. Some roads available revenue sources may be <br /> may be excluded (see Part considered for subdivision plat or <br /> III, Subsection 5). site plan approval. <br />Schools The capacity of public schools High School Feeder Areas as Programmed capacity in the first <br /> as calculated in accordance designated by the Cabarrus three (3) years of the Capital <br /> with the Public Schools of County School District, as Improvements Program may be <br /> North Carolina, State Board of applicable, considered in accordance with the <br /> Education, North Carolina formula set forth in Part III, <br /> Public School Facility Subsection 6. <br /> Guidelines (January 1997), <br /> which document is hereby <br /> incorporated by this reference, <br /> and including any successor <br /> documents are amendments <br /> thereto which may be <br /> published from time to time. <br /> <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.