My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 01 27
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 01 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:17 AM
Creation date
11/27/2017 11:40:06 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
1/27/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
renovating e%e YMCA's existing recreational facility located in <br /> <br />The Project will be located at Afbon Village near the intersection of <br />I-SS and Crisco Road in Concord, Caharrus County, North Carolina and <br />a= 101 YMCA Drive, Kannapolis, Cabarrus County, North Carolina The <br /> <br />Please take notice =hac the Board of Commissioners will bold a public <br />hearing in the Ccmmlssioners' Meeting Room at the Cabarrus County <br />Government Center, on Monday, July 22, 2002, at 6 30 p m or as soon <br />thereafter as the matter may be heard, at which any person may be <br /> <br />Any person wishing to comment in writing on the proposed Bonds and the <br />Project should do so, within fourteen (14) days after the date of <br /> <br /> Mr Rodger Lentz, Planning Vanager, presented Petition C02-03(S}, the <br />proposed Moorecrest Subdivision located on Poplar Tent Road between Harris <br />Road and Hun~ersville-Co~¢ord Road The developer (Dockside Development) <br />plans to develop 92 lots on 28 79 acres Utilities are to be provided by the <br />City of concord, however, wa=er is subject to the current City water <br />restrictions and will not be available until those restrictions are lifted. <br />It is estimated ~hac the subdivision will add approximately 55 students to <br />Cabarrus County B=hools The Planning a~d Zoning COmmission voted on May 16, <br /> <br /> Mr Alex Rank~n, PresAdent of Concord Engineering and Surveying, <br />reported the City of Concord is designing a water line fro~ Bkybrook that <br />will connect to the existing City water system on Poplar Tent Road This <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.