My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 03 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 03 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:29 AM
Creation date
11/27/2017 11:40:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/17/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-11-2002 13:04 SOUTHERN ENGINEERING 904 398 0018 P.04/05 <br /> <br />Page Four <br />SE No.: E02-281 <br />September 11, 2002 <br /> <br />NO~S (com~t~z~ <br />13) This proposal does NOT inetude the fottow~ng standard exclusion items: <br /> a) Grout, concrete fill or placement of same <br /> b) Touch-ap paint or painting <br /> c) Masonry anchors, ties or straps, unless specifically listed <br /> d) Rough hardware <br /> e) Column web doubler plates, ~m!ess specifically listed <br /> 0 Field dimensions or surveys <br /> g) Engineering design of connections or seals, unless otherwise noted <br /> h) Testing agency inspection costs <br /> i) Liquidated damages <br /> j) Permits, fees or bonds <br />15. Unless stated otherwise herein, this proposal includes en~neer's sealed calculations for only <br /> those connection designs provided by Southern Engineering. Sealed calculations will not be <br /> provided for simple shear connections that are A.I.S.C. prequalified. <br /> <br />T~m~s: Net 30 days, from date of invoice. <br />· Retaiaage, ia the amount of 10%, will be allowed wis a reduction to 5% upon 50% <br />substantial completion of our work. Final payment to be made 30 - 60 days after completion <br /> of our work, not total project. ' <br /> <br />We appreciate your interest in Southern Engineering and the oppommity to offer our proposal. <br />We anticipate serving you~ requirements to our mutual benefit. If we may be of fiarther service, <br />or should you have any questions, please call. <br /> <br />Robert R. Hack'worth <br />Executive Via: President <br /> <br />Attachments: ( 1 ) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.