My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 03 17
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 03 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:29 AM
Creation date
11/27/2017 11:40:30 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
3/17/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ U I T E :~ O 0 <br />CHANL~OTTE~, NC 2E204 <br />VOICIg: 7CI4,.73 ~ .?000 <br />FAX: 704,?$~ .TOg~ <br /> <br />SHEL~¥, NC ~150 <br />VOICE: ?O4,4Oe.eoOO <br /> <br />$ U I T E 3 o <br /> <br />mbaj.corn <br /> <br />M <br /> <br />DATE: <br /> <br />TO: <br /> <br />FROM: <br /> <br />E <br /> <br />COtVilVi'NO: <br /> <br /> M O R A N D U M <br /> <br />Tuesday, Zauuary 28, 2003 <br /> <br />Joe Sides <br /> <br />Kent Reid <br /> <br />Emergency Generator Upgrade at New Bethel Elementary and <br />P/tt School Road Elementary <br /> <br />0203 FILE NO: A-1.0 <br /> <br />Per you/request, MBAI Architecture has investigated increasing thc size of the <br />emergeticy generator to allow the Gymnasi, m, Dinning and Kitchen to be utilized as <br />au Eme/gency Shelter. <br /> <br />The following is the Proposed Budget for the Oena-ator Upgrade, including design <br />less and ~ontingency. <br /> <br />Prop,es_ed Budeet: (per school) <br /> <br /> Site ~ Grading a~ chiller yard, C~avel surface at chiller yard, ' <br /> Concrete pad at generator, Approx. 60 If of chain link $5,000.00 <br /> ,,, fencing. <br /> <br /> .Genera.! Increase main electrical room by approx. 150 sf. , $9,500.b0 <br /> <br />-MeChi Additional Controls/S.witChes, Etc. $5,000.00 <br />Elect/ Increase the generator size to 500 kw Diesel <br /> Machine, Increase tra~,for switching and panel board <br /> size. (N'amral Gas Machine would be an additional $185,000.00 <br />~ $~S,0p0.00) <br /> <br />CONSTRUCTION COST <br /> <br />, { $204,S00.00 <br /> <br />($359,500.00 if natural gas 8~ator is prefen'ed) <br /> <br />NON-CONSTRUCTION COST (Design fees for <br />mo~ficafio~ to ~e cons~cfion dog.eats) <br /> <br />CO~GENCY (10 %) <br /> <br />$15,000.00 <br /> <br />$20,450.00 <br /> <br />{ TOTAI~ BUDGET FOR GENERATOR UPGRADE <br /> <br />{$239,950.00 <br /> <br /> (per schnol) <br /> <br />If you have any questions or comments, please contact Darrell Watts or myself at <br />your earliest conven/ence. <br /> <br />Co: Darrell Watts, MBAZ Architecture. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.