My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2003 06 16
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2003
>
AG 2003 06 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2006 9:37:51 AM
Creation date
11/27/2017 11:41:10 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/16/2003
Board
Board of Commissioners
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 289251 <br />Drawn By: Ron Stephenson <br />Project Description: Underground <br /> extension <br /> <br />STATE OF NORTH CAROLINA <br />COUNTY OF Cabarrus <br /> <br />Return Address: Duke Energy <br />Attn: Ron Stephenson <br /> 182 Talbert Rd <br /> Mooresville, NC 28117 <br /> <br />RIGHT OF WAY AGREEMENT <br /> <br />KNOW ALL MEN BY THESE PRESENTS, That Cabarrus CounW t <br />hereinafter called "Grantor" (whether one or more), in consideration of the sum of One Dollar ($1.00) and other good and valuable <br />considerations, does hereby grant unto DUKE ENERGY, and its successors and assigns, subsidiaries and divisions, hereinafter called <br />"Grantee," the perpetual right, privilege and easement to go in and upon that certain land of Grantor (hereinafter "premises") situated <br />in said County and State, property described as: ~ <br /> Deed Book 3159, page 061 <br /> Tax Reference 4681-I 5-7264 <br /> <br />and over and across said premises within a right-of-way strip (check applicable): <br />[] having a width of .~ feet on each side of a centerline determined by the centerline of the electrical facilities as installed, to <br />construct, maintain and operate with poles, crossarms, ~wires, guys, anchors, cables, transformers and other apparatus and appliances, <br />overhead lines for the purpose of transporting electricity and for the communications purposes of the Grantee and regulated telephone <br />utilities. The following rights are also granted to Grantee: to enter said premises to inspect said lines, to perform maintenance and <br />repairs, and to make alteration, s and additions thereto, to remove from the right-of-way strip, now or at any time in the future, trees, <br />structures or other obstructions that may kndanger the proper maintenance and operation of said lines and trees of any species that <br />Grantee determines will grow at maturity to a height that will endanger the proper maintenance and operation of said lines; to trim or <br />remove and to keep trimmed or remove dead, diseased, weak or leaning trees or limbs outside of the right-of-way strip which, in the <br />opinion of the Grantee, might interfere with or fall upon the electric or communications facilities within the right-of-way strip; and to <br />install guy wires and anchors extending beyond the limits of the right-of-way strip. <br />[] having a width of 10 feet on each side of a centerline determined by the centerline of the electrical facilities as installed, to <br />construct, maintain and operate underground lines and conduits with other apparatus and appliances, either above ground or below <br />ground, to include transformers and service connections, for the purpose of transporting electricity and for the communications <br />purposes of Grantee and its licensees. The following rights are also granted to Grantee: to enter said premises to inspect said lines, to <br />perform maintenance and repairs, and to mal~e alterations and additions thereto; and to clear the land within the right-of-way strip and <br />to keep it clear of trees, structures or other obstructions; and to clear that land outside the right-of-way strip within ten feet of the <br />service door of any transformer or cabinet located within the right-of-way strip and to keep the area within ten feet of said door clear of <br />trees, structures or other obstructions. All underground facilities are to be installed in accordance with the provisions of Grantee's <br />Underground Distribution Installment Plan, NCUC Docket E-7, Sub 552, receipt of a copy of which is acknowledged by Grantor. <br /> This right-of-way is given to permit the construction of facilities presently proposed. Facilities at other locations and future extensions <br /> of presently constructed facilities are not permitted by this agreement. The foregoing notwithstanding, Grantee may relocate its <br /> facilities and right-of-way strip over the premises to conform to any future highway or street relocation, widening or improvement. <br /> 1 of 2 <br /> <br />/:.-,.:13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.