My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 02 18 (Regular)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 02 18 (Regular)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:00:56 PM
Creation date
11/27/2017 11:42:39 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
2/18/2002
Board
Board of Commissioners
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB-18-2002 MON 03;51 PM PSNO ENERGY MKTG F~X NO, 7048346555 P. 02 <br /> <br /> ERGY. <br /> <br />A $CANA COMPANY <br /> <br />February 1 S, 2002 <br /> <br />Mr. Frank Clifton <br />Managcr---eabarrus County <br />Concord, North Carolina 28026 <br /> <br />Dear Mr. Clifton: <br /> <br /> Subject to final agreements with Cabarrus County on the matters listed below, <br />PSNC Energy intends to install natural gas lines and facilities to servc your planncd arena <br />and exhibition buildings. <br /> <br /> As we have discussed with you, the net cost to PSNC Energy to make tiffs <br />installation exceeds $176,000. Under normal circumstances, we would deem this to bc <br />an economically unfeasible project. But, as the building is to be owned and operated by <br />the county and as there arc to bc additional county buildings constructed on and adjacent <br />to the arena property, we would like to make the investment cOntingent upon the <br />Ibllowing: <br /> <br />Your mechanical contractor and mechanical engineer have provided PSNC <br />Energy with a list of gas equipment and the estimates of usage of that <br />equipment. You agree that, as a minimum, the equipment will be installed <br />'when' the arena/exhibition area opens and will be in usc aa described for ten <br />(10) years from the opening datc et'thc facility, and Cabarma County agrces to <br />purchase natural 8as. from PSNC Energy for ten years from the opening date of <br />the facility, unless the North Carolina Utilities Commission alters thc terms of <br />such service. <br /> <br /> Thank you for your interest in nam'al gas, and PSNC Energy looks forward to having <br />the arena as a customer in tho fall of 2002. <br /> <br />Sincerely, <br /> <br />Jerry W. Richm'd$on <br />Vice President <br /> <br />PSNC Elmgy I Bt]O Gaston Road · Post Office Rotc 13~18 · G~onia, Norlh Camfiim · 28053-1308 .T 17041864.6731 - www. psncenergy, cm <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.