My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AG 2002 06 03 (Recessed)
CabarrusCountyDocuments
>
Public Meetings
>
Agendas
>
BOC
>
2002
>
AG 2002 06 03 (Recessed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2006 5:01:18 PM
Creation date
11/27/2017 11:43:27 AM
Metadata
Fields
Template:
Meeting Minutes
Doc Type
Agenda
Meeting Minutes - Date
6/3/2002
Board
Board of Commissioners
Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MATTHEWS <br />CONSTRUCTION <br /> <br />CO,, <br /> <br />INC. <br /> <br />2359 Perfmeter Pointe Parkway, Suite 175 <br /> (Phone) 704-357-6095 <br /> <br />ISSUE / PROPOSAL QUOTATION <br /> <br />Chadotte, NC 28208 <br />(Fax} 704-357-0590 <br /> <br /> PROJECT NOn: C121 <br /> <br /> ARCH. PROJECT NO.: 001476 <br /> <br /> DAYS ALLOWED <br /> FOR APPROVAL: 5 <br /> <br /> EXPIRATION DATE: 03/20/02 <br />~EQUESTED EXTENSION <br /> O.F TIME IN DAYS: 28 <br /> <br />PROJECT: CABARRUS COUNTY EXPOSITION PARK <br /> NO.: 030 DATE QUOTED: 03/15/02 <br /> TO: Tim Demmitt, AIA <br /> <br /> Overcash Demmitt Architects <br /> 1520 South Bird <br /> Chadotte, NC 28202 <br /> (Phone) 704-332-1615 (Fax) 704-332-0117 <br /> <br />DESCRIPTION: <br /> <br />To change grading and paving along Old Airport Road and Highway 49 based on drawings provided by Concord <br />Engineering and Surveying dated February 28, 2002, and' March 04, 2002. This change order request also incorporates <br />change made to accomodate regrading the project entrances to comply with the drawings and match the grades of the <br />roadways. <br /> <br />See attached Timberline Estimate and subcontractors breakdowns. <br />(See Fax Clarification request <br /> <br />~RACTORS/VENDORS ~ ~ :~-- :~ ~ <br /> <br /> APPROVAL [-'"--~" ~ ;~ <br /> ~? SUBTOTAL: I $369,808 <br /> <br />ARCH: <br /> <br /> DATE: <br />.OWNER: <br /> <br /> DATE: <br /> <br /> DISTRIBUTION <br /> <br />Joe H. Ervin Grading, David Ervin <br />Rea Construction - Rockwell, Jeff White <br /> <br /> FEE PERCENT: ]/ 5% <br /> <br /> TOTAL REQUEST AMOUNT: ~ <br /> MATTHEWS CONSTRUCTION CO., INC. <br /> <br />Signed By: <br /> <br /> W. Darrell Robertson, P.E., Project Manager <br /> Date: 3/15/02 <br /> <br />$18,490 <br />$388,298 <br />$0 <br />$388,298 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.