Laserfiche WebLink
Memo <br /> <br />ICASARRUS COUNTY I <br /> NORTH CAROLINA <br /> <br />To: <br />From: <br />Date: <br /> <br />Board o f Commi~r;~///~ <br />John D. Day <br />June 24, 2002 7 <br />First Union Building Renovations <br /> <br />In FY 2002, about $485,000 was budgeted for the first phase of the First Union Building <br />renovation project. In general terms, that phase included interior demolition and asbestos <br />removal in the tower portion, elevator replacement, replacement of the front interior <br />stairway (for code purposes), replacement of the fire escape, repair of masonry and roofs, <br />waterproofing the basement and exterior painting. <br /> <br />Approximately $100,000 has been spent this fiscal year for interior demolition, asbestos <br />removal and architect, engineering and testing fees. <br /> <br />Bids were opened May 28th for the remainder of phase one (bid tabulation is attached). <br />The low bid exceeds the funds available by about $212,000. <br /> <br />I have worked with CM Black Construction Company, Inc., of Concord, and Ken Griffin, <br />the architect, to reduce the scope of the project to match the funds available. By <br />eliminating the eleVator and interior stairway replacement, the project cost is reduced to <br />$335,344. This will accomplish all necessary repairs, except window replacement, to the <br />building's exterior (see letter from CM Black dated June 17, 2002 for details). I <br />recommend you approve the attached construction contract and authorize the county <br />manager to sign it. <br /> <br /> Office of the County Manager <br />P.O. BOx 707 · Concord, NC 28026-0707 · 704-920-2100 · Fax 704-920-2820 ° Charlotte 704-375-0829 <br />www. co.cabarrus.nc.us <br /> <br /> <br />