Laserfiche WebLink
APPENDIX B <br /> <br />Municipality will furnish industry flows to WSACC at the beginning Of each <br />month <br /> o WSACC will utilize flows for surcharge billing and compliance judgment <br /> <br />Other NPDES requirements for Pretreatment Program: <br /> · Maintain Headworks Analysis for the wastewater treatment plants which is used <br /> to determine the available loading into the plants <br /> c> A new HWA must be completed every 5 years and submitted to the State <br /> for approval <br /> o Maintain an Allocation Table, pursuant to the NPDES permit, which <br /> summarizes the results of the HWA and the limits from all of the FUTs. <br /> Permitted IUP loadings for each parameter or pollutant cannot exceed the <br /> treatment capacity of the plant as determined by the HWA. <br /> · Conduct an Industrial Waste Survey of the entire service area every 5 years and <br /> submit to the State for approval <br /> o Requires that all users of the sewer collection system be surveyed to <br /> determine actual discharge <br /> · Develop and implement a Long Term Monitoring Plan (LTMP) for data <br /> collection to be used in the HWA for the development of specific pretreatment <br /> local limits. LTMP must be approved by the State <br /> · ~ Develop and enforce an Enforcement Response Plan for handling noncompliant <br /> users <br /> · Publish annually a list of Significant Industrial Users that were in Significant <br /> Noncompliance with pretreatment standards in the IUP and/or SUO during the <br /> previous 12 month period <br /> · Maintain for a minimum of 3 years records of monitoring activities and results <br /> and other records of industrial impact on the wastewater treatment plant <br /> · Maintain adequate legal authority through the SUO in order to implement the <br /> pretreatment program <br /> <br />2 <br /> <br /> <br />