Laserfiche WebLink
Exhibit A to Memorandum of Lease <br />by and between County of Cabarrus <br />and Church of God Children's Home <br />of North Carolina, Inc. Page 3 of 3 <br /> <br />A SCAN,,4 COMt~ANY <br /> <br />PIPELINE RIGHT OF WAY RESTRICTIONS <br /> <br /> · No permanent structures may be built within the right of way. <br /> · No water may be impotmded over the right of way. <br /> · NO cover may be removed from the right of way. <br /> o. Excess cover placed on the right of way is limited, to four (4) feet above the <br /> existing grade. <br /> ° No. driveways or roadways may be installed within and parallel to the right of <br /> way, but may cross perpendicularly (90 degree angle), if the necessary grade <br /> requirements are met and with prior approval. <br /> · Other utilities (water, sewer, power, cable TV, etc.) must cross'the right of way at <br /> a perpendicular (90 de~ee) angle, pre£erably'below the pipeline and with a <br /> minimum clearance of one (1) foot. Ail such installations must be approved prior <br /> to construction and an encroachment agreement signed by the encroaching party. <br /> · No trees may be planted within the right of way. <br /> ° The company reserves the right to enter and exit to and along the right of way, <br /> o · Privacy and stockade - type fences are not permitted on the fight of way, however <br /> other types of fences may be permitted. Gates must be p.rovided to allow <br /> 'equipment access to the right of way. <br />o The company assumes no responsibility for damages to facilities within the fight <br /> of way due to the operation, maintenance, or alterations of our pipeline system. <br />· Pipeline markers installed within the right of way must remain. Defacing, <br /> damaging, removing and destroying.are a Federal Offence subject to a $5000 fine <br /> and 1 year imprisonment. '" -. <br />- Power / utility, poles are not permitted within the right of way. ." <br />· Septic tanks, leach fields, and sewer mardaoles are not permitted within the right <br /> of way. <br />° Wells are not permitted within the right of way. <br /> <br />Listed above are the answers to the most conn-nonly asked questions concerning the use <br />of our pipeline right of ways. There may be additional limitations for each specific right <br />of way, please call if you should have any questions. <br /> <br />For PSNC Pipeli~ze informatio~z call toll free ]-800-296-0356. Prior to any construction <br />along and adjacent to the right of way call The North Carolina One Call Center, Inc. at <br />1-800-632-4949 <br /> <br />PSNC Representative: <br /> <br />Telephone: <br /> <br /> <br />